Financial News

Electrifying District Energy Systems Could Avoid up to $2.5 Billion a Year in Ontario Electricity System Costs

ⓘ This article is third-party content and does not represent the views of this site. We make no guarantees regarding its accuracy or completeness.

An electric-first approach to district energy systems could meet growing heating needs while reducing peak demand and avoiding new ratepayer costs

Electrifying Ontario’s existing district energy systems, rather than electrifying the same buildings one by one, could avoid between $740 million and $2.5 billion a year in electricity system costs, according to new analysis from the International District Energy Association (IDEA). The report was developed with contributions from several Ontario-based district energy industry members.

Electric-First District Energy uses large electric heat pumps, or in some cases electric boilers, as the primary source of heat for groups of connected buildings. Existing non-electric equipment remains available during extreme cold and periods of peak electricity demand, allowing systems to reduce their electricity use to near zero when the grid is under the greatest strain without interrupting heat service.

The report, titled District Energy: A Smarter Way to Meet Ontario’s Growing Demand for Electric Heat, finds that this approach can help meet growing demand for electrified heating while reducing the need for new generation, transmission, and local distribution infrastructure.

This flexibility could reduce Ontario’s peak electricity demand by approximately 1,400 MW compared with electrifying the same buildings using individual heat pumps, and by as much as 4,100 MW compared with electric resistance heating.

“Ontario’s electricity system is entering a period of significant growth, and how we meet the increasing demand for electric heating will shape the infrastructure Ontario needs to support overall demand growth,” said Carlyle Coutinho, Chief Executive Officer of Enwave Energy Corporation, one of the Ontario district energy providers that contributed to the report. “Electric-First District Energy provides a practical way to electrify heat across many buildings at once while managing demand during the most challenging hours for the grid. That means better use of existing and new infrastructure and lower costs for the electricity system as a whole.”

Ontario has more than 60 operating district energy systems with 4,955 MW of installed thermal capacity, providing an existing platform on which to build. However, the province’s current electricity procurement framework does not provide the long-term revenue certainty required to finance the substantial upfront investment involved in electrifying these systems.

The report recommends that Ontario establish a stable, multi-year revenue pathway through a long-term capacity contract for controllable (dispatchable) electricity demand, a dedicated program within the Independent Electricity System Operator’s (IESO) electricity demand-side management (eDSM) framework, or a combination of the two.

“Ontario has an opportunity to turn a major source of future electricity demand into a flexible resource that strengthens the grid,” said Rob Thornton, President and Chief Executive Officer of the International District Energy Association. “The province already recognizes that major investments in generation and storage require long-term revenue certainty. Applying that same principle to Electric-First District Energy would allow these projects to move forward and deliver value to Ontario for decades.”

Ontario’s electricity demand is expected to increase 65 per cent by 2050, according to the IESO’s 2026 Annual Planning Outlook, with space, water, and industrial process heating accounting for up to 8.6 per cent of that growth. Large district energy projects can take three to seven years to develop, making a near-term pathway important to having new resources available as electricity demand accelerates in the early 2030s.

Ontario’s first integrated energy plan, Energy for Generations, has already directed the IESO to identify opportunities to support the expansion of district energy systems. The report calls on the province and the IESO to translate that direction into a workable program or contracting pathway.

The full report is available at https://www.districtenergy.org/resources/electrification-ontario.

About the International District Energy Association

The International District Energy Association (IDEA) is a 501(c)(6) nonprofit industry association founded in 1909 and based in Massachusetts, USA. Representing nearly 3,000 members across more than 30 countries, IDEA champions district heating, district cooling, thermal networks, and combined heat and power (CHP) as reliable, efficient, and sustainable solutions. Its mission is to foster the success of its members as global leaders in advancing energy efficiency, reducing carbon emissions, and building resilient, sustainable communities.

“Ontario has an opportunity to turn a major source of future electricity demand into a flexible resource that strengthens the grid,” said Rob Thornton, President and Chief Executive Officer of the International District Energy Association.

Contacts

Report this content

If you believe this article contains misleading, harmful, or spam content, please let us know.

Report this article

Recent Quotes

View More
Symbol Price Change (%)
AMZN  246.82
+0.00 (0.00%)
AAPL  342.56
+0.00 (0.00%)
AMD  424.39
+0.00 (0.00%)
BAC  47.04
+0.00 (0.00%)
GOOG  264.00
+0.00 (0.00%)
META  560.84
+0.00 (0.00%)
MSFT  484.52
+0.00 (0.00%)
NVDA  125.53
+0.00 (0.00%)
ORCL  101.19
+0.00 (0.00%)
TSLA  345.82
+0.00 (0.00%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.

Use the myMotherLode.com Keyword Search to go straight to a specific page

Popular Pages

  • Local News
  • US News
  • Weather
  • State News
  • Events
  • Traffic
  • Sports
  • Dining Guide
  • Real Estate
  • Classifieds
  • Financial News
  • Fire Info
Feedback