UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 10-Q

 

x

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended March 31, 2008

 

OR

 

 

o

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from               to              

 

Commission File Number: 1-3034

 

Xcel Energy Inc.

(Exact name of registrant as specified in its charter)

 

Minnesota

 

41-0448030

(State or other jurisdiction of

 

(I.R.S. Employer Identification No.)

incorporation or organization)

 

 

 

 

 

414 Nicollet Mall, Minneapolis, Minnesota

 

55401

(Address of principal executive offices)

 

(Zip Code)

 

Registrant’s telephone number, including area code (612) 330-5500

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.   x Yes o No

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one): x Large accelerated filer o Accelerated filer o Non-accelerated filer o Smaller Reporting Company

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). 
o Yes  x No

 

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date.

 

Class

 

Outstanding at April 25, 2008

Common Stock, $2.50 par value

 

430,857,162 shares

 

 



 

TABLE OF CONTENTS

 

PART I — FINANCIAL INFORMATION

 

Item 1. Financial Statements (unaudited)

 

CONSOLIDATED STATEMENTS OF INCOME

 

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

CONSOLIDATED BALANCE SHEETS

 

CONSOLIDATED STATEMENTS OF COMMON STOCKHOLDERS’ EQUITY AND COMPREHENSIVE INCOME

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

 

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

Item 3. Quantitative and Qualitative Disclosures about Market Risk

 

Item 4. Controls and Procedures

 

PART II — OTHER INFORMATION

 

Item 1. Legal Proceedings

 

Item 1A. Risk Factors

 

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

 

Item 6. Exhibits

 

SIGNATURES

 

Certifications Pursuant to Section 302

 

Certifications Pursuant to Section 906

 

Statement Pursuant to Private Litigation

 

 

2



 

PART I — FINANCIAL INFORMATION

 

Item 1. Financial Statements

 

XCEL ENERGY INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF INCOME (UNAUDITED)

 

 

 

Three Months Ended
March 31,

 

(Thousands of Dollars, Except Per Share Data)

 

2008

 

2007

 

 

 

 

 

 

 

Operating revenues

 

 

 

 

 

Electric utility

 

$

1,973,314

 

$

1,815,803

 

Natural gas utility

 

1,034,127

 

927,422

 

Other

 

20,947

 

20,437

 

Total operating revenues

 

3,028,388

 

2,763,662

 

 

 

 

 

 

 

Operating expenses

 

 

 

 

 

Electric fuel and purchased power – utility

 

1,088,080

 

979,571

 

Cost of natural gas sold and transported – utility

 

823,127

 

740,782

 

Cost of sales – other

 

5,453

 

6,025

 

Other operating and maintenance expenses

 

482,909

 

467,567

 

Depreciation and amortization

 

219,288

 

213,413

 

Taxes (other than income taxes)

 

79,413

 

78,176

 

Total operating expenses

 

2,698,270

 

2,485,534

 

 

 

 

 

 

 

Operating income

 

330,118

 

278,128

 

 

 

 

 

 

 

Interest and other income, net

 

8,884

 

816

 

Allowance for funds used during construction – equity

 

14,220

 

7,576

 

 

 

 

 

 

 

Interest charges and financing costs

 

 

 

 

 

Interest charges – includes other financing costs of $4,991 and $6,271, respectively

 

132,171

 

127,303

 

Allowance for funds used during construction – debt

 

(9,527

)

(7,206

)

Total interest charges and financing costs

 

122,644

 

120,097

 

 

 

 

 

 

 

Income from continuing operations before income taxes

 

230,578

 

166,423

 

Income taxes

 

76,584

 

47,909

 

Income from continuing operations

 

153,994

 

118,514

 

Income (loss) from discontinued operations, net of tax

 

(877

)

1,197

 

Net income

 

153,117

 

119,711

 

Dividend requirements on preferred stock

 

1,060

 

1,060

 

Earnings available to common shareholders

 

$

152,057

 

$

118,651

 

 

 

 

 

 

 

Weighted average common shares outstanding (thousands)

 

 

 

 

 

Basic

 

429,563

 

408,003

 

Diluted

 

434,853

 

432,054

 

Earnings per share – basic

 

 

 

 

 

Income from continuing operations

 

$

0.35

 

$

0.29

 

Discontinued operations

 

 

 

Earnings per share – basic

 

$

0.35

 

$

0.29

 

Earnings per share – diluted

 

 

 

 

 

Income from continuing operations

 

$

0.35

 

$

0.28

 

Discontinued operations

 

 

 

Earnings per share – diluted

 

$

0.35

 

$

0.28

 

 

 

 

 

 

 

Cash dividends declared per common share

 

$

0.23

 

$

0.22

 

 

See Notes to Consolidated Financial Statements

 

3



 

XCEL ENERGY INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS (UNAUDITED)

(Thousands of Dollars)

 

 

 

Three Months Ended
March 31,

 

 

 

2008

 

2007

 

 

 

 

 

 

 

Operating activities

 

 

 

 

 

Net income

 

$

153,117

 

$

119,711

 

Remove loss (income) from discontinued operations

 

877

 

(1,197

)

Adjustments to reconcile net income to cash provided by operating activities:

 

 

 

 

 

Depreciation and amortization

 

226,271

 

222,733

 

Nuclear fuel amortization

 

13,388

 

11,554

 

Deferred income taxes

 

87,361

 

43,060

 

Amortization of investment tax credits

 

(1,948

)

(2,427

)

Allowance for equity funds used during construction

 

(14,220

)

(7,576

)

Undistributed equity in earnings of unconsolidated affiliates

 

(510

)

(695

)

Share-based compensation expense

 

5,774

 

4,469

 

Net realized and unrealized hedging and derivative transactions

 

22,719

 

41,763

 

Changes in operating assets and liabilities:

 

 

 

 

 

Accounts receivable

 

(11,920

)

(57,237

)

Accrued unbilled revenues

 

138,410

 

(6,542

)

Inventories

 

106,477

 

118,475

 

Recoverable purchased natural gas and electric energy costs

 

(78,192

)

179,028

 

Other current assets

 

7,053

 

8,296

 

Accounts payable

 

(1,692

)

(147,135

)

Net regulatory assets and liabilities

 

11,195

 

(7,620

)

Other current liabilities

 

(65,915

)

82,007

 

Change in other noncurrent assets

 

(24,359

)

(16,881

)

Change in other noncurrent liabilities

 

1,370

 

(621

)

Operating cash flows provided by (used in) discontinued operations

 

(25,774

)

16,201

 

Net cash provided by operating activities

 

549,482

 

599,366

 

 

 

 

 

 

 

Investing activities

 

 

 

 

 

Utility capital/construction expenditures

 

(489,775

)

(482,410

)

Allowance for equity funds used during construction

 

14,220

 

7,576

 

Purchase of investments in external decommissioning fund

 

(227,987

)

(149,841

)

Proceeds from the sale of investments in external decommissioning fund

 

217,139

 

138,993

 

Nonregulated capital expenditures and asset acquisitions

 

(124

)

(135

)

Investment in WYCO

 

(23,026

)

 

Change in restricted cash

 

757

 

2,381

 

Other investments

 

519

 

4,959

 

Net cash used in investing activities

 

(508,277

)

(478,477

)

 

 

 

 

 

 

Financing activities

 

 

 

 

 

Proceeds from (repayment of) short-term borrowings – net

 

(710,643

)

108,200

 

Proceeds from issuance of long-term debt

 

893,021

 

 

Repayment of long-term debt, including reacquisition premiums

 

(972

)

(101,208

)

Early participation payments on debt exchange

 

 

(4,859

)

Proceeds from issuance of common stock

 

1,564

 

4,509

 

Dividends paid

 

(99,679

)

(91,683

)

Net cash provided by (used in) financing activities

 

83,291

 

(85,041

)

 

 

 

 

 

 

Net increase in cash and cash equivalents

 

124,496

 

35,848

 

Net increase (decrease) in cash and cash equivalents – discontinued operations

 

225

 

(8,303

)

Cash and cash equivalents at beginning of year

 

51,120

 

37,458

 

Cash and cash equivalents at end of quarter

 

$

175,841

 

$

65,003

 

Supplemental disclosure of cash flow information

 

 

 

 

 

Cash paid for interest (net of amounts capitalized)

 

$

123,368

 

$

110,606

 

Cash paid (received) for income taxes (net of refunds received)

 

(1,092

)

4,230

 

Supplemental disclosure of non-cash investing transactions:

 

 

 

 

 

Property, plant and equipment additions in accounts payable

 

$

29,119

 

$

50,162

 

Supplemental disclosure of non-cash financing transactions:

 

 

 

 

 

Issuance of common stock for reinvested dividends and 401(k) plans

 

$

34,578

 

$

30,600

 

 

See Notes to Consolidated Financial Statements

 

4



 

XCEL ENERGY INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS (UNAUDITED)

(Thousands of Dollars)

 

 

 

March 31, 2008

 

Dec. 31, 2007

 

ASSETS

 

 

 

 

 

Current assets:

 

 

 

 

 

Cash and cash equivalents

 

$

175,841

 

$

51,120

 

Accounts receivable, net

 

963,500

 

951,580

 

Accrued unbilled revenues

 

593,549

 

731,959

 

Inventories

 

425,133

 

531,610

 

Recoverable purchased natural gas and electric energy costs

 

151,607

 

73,415

 

Derivative instruments valuation

 

81,364

 

94,554

 

Prepayments and other

 

172,332

 

244,134

 

Current assets held for sale and related to discontinued operations

 

124,427

 

128,821

 

Total current assets

 

2,687,753

 

2,807,193

 

 

 

 

 

 

 

Property, plant and equipment, net

 

16,955,142

 

16,675,689

 

 

 

 

 

 

 

Other assets:

 

 

 

 

 

Nuclear decommissioning fund and other investments

 

1,312,843

 

1,372,098

 

Regulatory assets

 

1,115,894

 

1,115,443

 

Prepaid pension asset

 

579,223

 

568,055

 

Derivative instruments valuation

 

369,609

 

383,861

 

Other

 

196,320

 

142,078

 

Noncurrent assets held for sale and related to discontinued operations

 

141,836

 

120,310

 

Total other assets

 

3,715,725

 

3,701,845

 

Total assets

 

$

23,358,620

 

$

23,184,727

 

 

 

 

 

 

 

LIABILITIES AND EQUITY

 

 

 

 

 

Current liabilities:

 

 

 

 

 

Current portion of long-term debt

 

$

741,571

 

$

637,535

 

Short-term debt

 

377,917

 

1,088,560

 

Accounts payable

 

1,064,160

 

1,079,345

 

Taxes accrued

 

264,275

 

240,443

 

Dividends payable

 

100,079

 

99,682

 

Derivative instruments valuation

 

46,497

 

58,811

 

Other

 

326,533

 

419,209

 

Current liabilities held for sale and related to discontinued operations

 

10,106

 

17,539

 

Total current liabilities

 

2,931,138

 

3,641,124

 

 

 

 

 

 

 

Deferred credits and other liabilities:

 

 

 

 

 

Deferred income taxes

 

2,560,544

 

2,553,526

 

Deferred investment tax credits

 

110,966

 

112,914

 

Asset retirement obligations

 

1,333,715

 

1,315,144

 

Regulatory liabilities

 

1,399,544

 

1,389,987

 

Pension and employee benefit obligations

 

566,132

 

576,426

 

Derivative instruments valuation

 

371,300

 

384,419

 

Customer advances

 

312,208

 

305,239

 

Other

 

150,998

 

137,422

 

Noncurrent liabilities held for sale and related to discontinued operations

 

20,277

 

20,384

 

Total deferred credits and other liabilities

 

6,825,684

 

6,795,461

 

 

 

 

 

 

 

Commitments and contingent liabilities

 

 

 

 

 

Capitalization:

 

 

 

 

 

Long-term debt

 

7,139,770

 

6,342,160

 

Preferred stockholders’ equity – authorized 7,000,000 shares of $100 par value; outstanding shares: 1,049,800

 

104,980

 

104,980

 

Common stockholders’ equity – authorized 1,000,000,000 shares of $2.50 par value; outstanding shares: March 31, 2008 – 430,512,282; Dec. 31, 2007 – 428,782,700

 

6,357,048

 

6,301,002

 

Total liabilities and equity

 

$

23,358,620

 

$

23,184,727

 

 

See Notes to Consolidated Financial Statements

 

5



 

XCEL ENERGY INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMMON STOCKHOLDERS’ EQUITY
AND COMPREHENSIVE INCOME

(UNAUDITED)
(Thousands of Dollars)

 

 

 

Common Stock Issued

 

 

 

Accumulated

 

Total

 

 

 

Shares

 

Par Value

 

Additional
Paid In
Capital

 

Retained
Earnings

 

Other
Comprehensive
Income (Loss)

 

Common
Stockholders’ 
Equity

 

Three months ended March 31, 2008 and 2007

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Balance at Dec. 31, 2006

 

407,297

 

$

1,018,242

 

$

4,043,657

 

$

771,249

 

$

(16,326

)

$

5,816,822

 

FIN 48 adoption

 

 

 

 

 

 

 

2,207

 

 

 

2,207

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net income

 

 

 

 

 

 

 

119,711

 

 

 

119,711

 

Changes in unrecognized amounts of pension and retiree medical benefits, net of tax of $125

 

 

 

 

 

 

 

 

 

487

 

487

 

Net derivative instrument fair value changes during the period, net of tax of $(1,888)

 

 

 

 

 

 

 

 

 

(800

)

(800

)

Unrealized gain - marketable securities, net of tax of $2

 

 

 

 

 

 

 

 

 

4

 

4

 

Comprehensive income for the period

 

 

 

 

 

 

 

 

 

 

 

119,402

 

Dividends declared:

 

 

 

 

 

 

 

 

 

 

 

 

 

Cumulative preferred stock

 

 

 

 

 

 

 

(1,060

)

 

 

(1,060

)

Common stock

 

 

 

 

 

 

 

(90,959

)

 

 

(90,959

)

Issuances of common stock

 

1,564

 

3,910

 

12,262

 

 

 

 

 

16,172

 

Share-based compensation

 

 

 

 

 

5,667

 

 

 

 

 

5,667

 

Balance at March 31, 2007

 

408,861

 

$

1,022,152

 

$

4,061,586

 

$

801,148

 

$

(16,635

)

$

5,868,251

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Balance at Dec. 31, 2007

 

428,783

 

$

1,071,957

 

$

4,286,917

 

$

963,916

 

$

(21,788

)

$

6,301,002

 

EITF 06-4 adoption, net of tax of $(1,038)

 

 

 

 

 

 

 

(1,640

)

 

 

(1,640

)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net income

 

 

 

 

 

 

 

153,117

 

 

 

153,117

 

Changes in unrecognized amounts of pension and retiree medical benefits, net of tax of $635

 

 

 

 

 

 

 

 

 

(189

)

(189

)

Net derivative instrument fair value changes during the period, net of tax of $(1,790)

 

 

 

 

 

 

 

 

 

(5,626

)

(5,626

)

Comprehensive income for the period

 

 

 

 

 

 

 

 

 

 

 

147,302

 

Dividends declared:

 

 

 

 

 

 

 

 

 

 

 

 

 

Cumulative preferred stock

 

 

 

 

 

 

 

(1,060

)

 

 

(1,060

)

Common stock

 

 

 

 

 

 

 

(99,016

)

 

 

(99,016

)

Issuances of common stock

 

1,729

 

4,324

 

52

 

 

 

 

 

4,376

 

Share-based compensation

 

 

 

 

 

6,084

 

 

 

 

 

6,084

 

Balance at March 31, 2008

 

430,512

 

$

1,076,281

 

$

4,293,053

 

$

1,015,317

 

$

(27,603

)

$

6,357,048

 

 

See Notes to Consolidated Financial Statements

 

6



 

XCEL ENERGY INC. AND SUBSIDIARIES

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)

 

In the opinion of management, the accompanying unaudited consolidated financial statements contain all adjustments necessary to present fairly the financial position of Xcel Energy Inc. and its subsidiaries (collectively, Xcel Energy) as of March 31, 2008, and Dec. 31, 2007; the results of its operations and changes in stockholders’ equity for the three months ended March 31, 2008 and 2007; and its cash flows for the three months ended March 31, 2008 and 2007. Due to the seasonality of Xcel Energy’s electric and natural gas sales, such interim results are not necessarily an appropriate base from which to project annual results.

 

1.     Significant Accounting Policies

 

Except to the extent updated or described below, the significant accounting policies set forth in Note 1 to the consolidated financial statements in Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2007, appropriately represent, in all material respects, the current status of accounting policies and are incorporated herein by reference.

 

Fair Value Measurements –Xcel Energy presents interest rate derivatives, commodity derivatives, and nuclear decommissioning fund assets at estimated fair values in its consolidated financial statements.  For interest rate derivatives, broker quotes are used to establish fair value.  For commodity derivatives, the most observable inputs available are used to determine the fair value of each contract.  In the absence of a quoted price for an identical contract in an active market, Xcel Energy may use broker quotes for identical or similar contracts, or internally prepared valuation models to determine fair value.  For the nuclear decommissioning fund, published trading data, broker quotes and market inputs are utilized to estimate fair value for each class of security.

 

2.     Recently Issued Accounting Pronouncements

 

Statement of Financial Accounting Standards (SFAS) No. 157 Fair Value Measurements (SFAS No. 157)  — In September 2006, the Financial Accounting Standards Board (FASB) issued SFAS No. 157, which provides a single definition of fair value, together with a framework for measuring it, and requires additional disclosure about the use of fair value to measure assets and liabilities. SFAS No. 157 also emphasizes that fair value is a market-based measurement, and sets out a fair value hierarchy with the highest priority being quoted prices in active markets. Fair value measurements are disclosed by level within that hierarchy. SFAS No. 157 is effective for financial statements issued for fiscal years beginning after Nov. 15, 2007.

 

In February 2008, the FASB issued Effective Date of FASB Statement No. 157 (FASB Statement of Position (FSP) No. 157-2 (FSP No. 157-2)).  FSP No. 157-2 delays the effective date of SFAS No. 157 until fiscal years beginning after Nov. 15, 2008, for fair value measurements of non-financial assets and non-financial liabilities, except for items that are recognized or disclosed at fair value in an entity’s financial statements on a recurring basis (at least annually).

 

As of Jan. 1, 2008, Xcel Energy adopted SFAS No. 157 for all assets and liabilities measured at fair value except for non-financial assets and non-financial liabilities measured at fair value on a non-recurring basis, as permitted by FSP No. 157-2.  The adoption did not have a material impact on its consolidated financial statements.  For additional discussion and SFAS No. 157 required disclosures see Note 11 to the consolidated financial statements.

 

The Fair Value Option for Financial Assets and Financial Liabilities — Including an Amendment of FASB Statement No. 115 (SFAS No. 159) — In February 2007, the FASB issued SFAS No. 159, which provides companies with an option to measure, at specified election dates, many financial instruments and certain other items at fair value that are not currently measured at fair value. A company that adopts SFAS No. 159 will report unrealized gains and losses on items, for which the fair value option has been elected, in earnings at each subsequent reporting date. This statement also establishes presentation and disclosure requirements designed to facilitate comparisons between entities that choose different measurement attributes for similar types of assets and liabilities. This statement is effective for fiscal years beginning after Nov. 15, 2007, effective Jan. 1, 2008. Xcel Energy adopted SFAS No. 159 and the adoption did not have a material impact on its consolidated financial statements.

 

Business Combinations (SFAS No. 141 (revised 2007)) — In December 2007, the FASB issued SFAS No. 141R, which establishes principles and requirements for how an acquirer in a business combination recognizes and measures in its financial statements the identifiable assets acquired, the liabilities assumed, and any noncontrolling interest; recognizes and measures the goodwill acquired in the business combination or a gain from a bargain purchase; and determines what

 

7



 

information to disclose to enable users of the financial statements to evaluate the nature and financial effects of the business combination. SFAS No. 141R is to be applied prospectively to business combinations for which the acquisition date is on or after the beginning of an entity’s fiscal year that begins on or after Dec. 15, 2008. Xcel Energy will evaluate the impact of SFAS No. 141R on its consolidated financial statements for any potential business combinations subsequent to Jan. 1, 2009.

 

Noncontrolling Interests in Consolidated Financial Statements, an Amendment of Accounting Research Bulletin (ARB) No. 51 (SFAS No. 160)  In December 2007, the FASB issued SFAS No. 160, which establishes accounting and reporting standards that require the ownership interest in subsidiaries held by parties other than the parent be clearly identified and presented in the consolidated balance sheets within equity, but separate from the parent’s equity; the amount of consolidated net income attributable to the parent and the noncontrolling interest be clearly identified and presented on the face of the consolidated statement of earnings; and changes in a parent’s ownership interest while the parent retains its controlling financial interest in its subsidiary be accounted for consistently. This statement is effective for fiscal years beginning on or after Dec. 15, 2008. Xcel Energy is evaluating the impact of SFAS No. 160 on its consolidated financial statements.

 

Disclosures about Derivative Instruments and Hedging Activities  (SFAS No. 161) In March 2008, the FASB issued SFAS No. 161, which is intended to enhance disclosures to help users of the financial statements better understand how derivative instruments and hedging activities affect an entity’s financial position, financial performance and cash flows.  SFAS No. 161 amends and expands the disclosure requirements of SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities”, to require disclosures of objectives and strategies for using derivatives, gains and losses on derivative instruments, and credit-risk-related contingent features in derivative agreements.  SFAS No. 161 is effective for financial statements issued for fiscal years and interim periods beginning after Nov. 15, 2008, with early application encouraged.  Xcel Energy is currently evaluating the impact of adoption of SFAS No. 161.

 

Accounting for Deferred Compensation and Postretirement Benefit Aspects of Endorsement Split-Dollar Life Insurance Arrangements (Emerging Issues Task Force (EITF) Issue No. 06-4) In June 2006, the EITF reached a consensus on EITF No. 06-4, which provides guidance on the recognition of a liability and related compensation costs for endorsement split-dollar life insurance policies that provide a benefit to an employee that extends to postretirement periods. Therefore, this EITF would not apply to a split-dollar life insurance arrangement that provides a specified benefit to an employee that is limited to the employee’s active service period with an employer.  EITF No. 06-4 is effective for fiscal years beginning after Dec. 15, 2007, with earlier application permitted.  Upon adoption of EITF 06-4 on Jan. 1, 2008, Xcel Energy recorded a liability of $1.6 million, net of tax, as a reduction of retained earnings.  Thereafter, changes in the liability will be reflected in operating results.

 

Accounting for Income Tax Benefits of Dividends on Share-Based Payment Awards (EITF No. 06-11) In June 2007, the EITF reached a consensus on EITF No. 06-11, which states that an entity should recognize a realized tax benefit associated with dividends on nonvested equity shares and nonvested equity share units charged to retained earnings as an increase in additional paid in capital. The amount recognized in additional paid in capital should be included in the pool of excess tax benefits available to absorb potential future tax deficiencies on share-based payment awards. EITF No. 06-11 should be applied prospectively to income tax benefits of dividends on equity-classified share-based payment awards that are declared in fiscal years beginning after Dec. 15, 2007. The adoption of EITF No. 06-11 did not have a material impact on Xcel Energy’s consolidated financial statements.

 

3.     Selected Balance Sheet Data

 

(Thousands of Dollars)

 

March 31, 2008

 

Dec. 31, 2007

 

 

 

 

 

 

 

Accounts receivable, net:

 

 

 

 

 

Accounts receivable

 

$

1,011,870

 

$

1,000,981

 

Less allowance for bad debts

 

(48,370

)

(49,401

)

 

 

$

963,500

 

$

951,580

 

 

 

 

 

 

 

Inventories:

 

 

 

 

 

Materials and supplies

 

$

157,294

 

$

152,770

 

Fuel

 

157,410

 

142,764

 

Natural gas

 

110,429

 

236,076

 

 

 

$

425,133

 

$

531,610

 

 

8



 

(Thousands of Dollars)

 

March 31, 2008

 

Dec. 31, 2007

 

Property, plant and equipment, net:

 

 

 

 

 

Electric utility plant

 

$

20,470,908

 

$

20,313,313

 

Natural gas utility plant

 

2,969,077

 

2,946,455

 

Common utility and other property

 

1,481,246

 

1,475,325

 

Construction work in progress

 

2,005,856

 

1,810,664

 

Total property, plant and equipment

 

26,927,087

 

26,545,757

 

Less accumulated depreciation

 

(10,200,128

)

(10,049,927

)

Nuclear fuel

 

1,532,941

 

1,471,229

 

Less accumulated amortization

 

(1,304,758

)

(1,291,370

)

 

 

$

16,955,142

 

$

16,675,689

 

 

4.     Discontinued Operations

 

A summary of the subsidiaries presented as discontinued operations is discussed below.  Results of operations for divested businesses are reported, for all periods presented, as discontinued operations.  In addition, the remaining assets and liabilities related to the businesses divested or discontinued have been reclassified to assets and liabilities in the consolidated balance sheets.  The majority of current and noncurrent assets related to discontinued operations are deferred tax assets associated with temporary differences and net operating loss (NOL) and tax credit carryforwards, originally from discontinued operations, that will be deductible in future years.

 

Nonregulated Subsidiaries

 

Seren Innovations Inc., NRG Energy, Inc., e prime, Xcel Energy International, Utility Engineering, and Quixx, which were all sold in 2006 or earlier, continue to have activity and balances reflected on Xcel Energy’s financial statements as reported in the tables below.

 

Summarized Financial Results of Discontinued Operations

 

(Thousands of Dollars)

 

2008

 

2007

 

 

 

 

 

 

 

Three months ended March 31,

 

 

 

 

 

Operating revenues

 

$

 

$

36

 

Operating expense, interest and other income, net

 

31

 

(233

)

Pretax income (loss) from discontinued operations

 

(31

)

269

 

Income tax expense (benefit)

 

846

 

(928

)

Net income (loss) from discontinued operations

 

$

(877

)

$

1,197

 

 

The major classes of assets and liabilities held for sale and related to discontinued operations are as follows:

 

(Thousands of Dollars)

 

March 31, 2008

 

Dec. 31, 2007

 

 

 

 

 

 

 

Cash

 

$

7,017

 

$

6,792

 

Accounts receivable, net

 

771

 

913

 

Deferred income tax benefits

 

101,256

 

118,919

 

Other current assets

 

15,383

 

2,197

 

Current assets related to discontinued operations

 

$

124,427

 

$

128,821

 

Deferred income tax benefits

 

$

118,469

 

$

97,284

 

Other noncurrent assets

 

23,367

 

23,026

 

Noncurrent assets related to discontinued operations

 

$

141,836

 

$

120,310

 

Accounts payable

 

$

1,033

 

$

1,060

 

Other current liabilities

 

9,073

 

16,479

 

Current liabilities related to discontinued operations

 

$

10,106

 

$

17,539

 

Other noncurrent liabilities

 

$

20,277

 

$

20,384

 

Noncurrent liabilities related to discontinued operations

 

$

20,277

 

$

20,384

 

 

9



 

5.     Income Taxes

 

Accounting for Uncertainty in Income Taxes — an interpretation of FASB Statement No. 109 (FIN 48) — Xcel Energy files a consolidated federal income tax return and state tax returns based on income in its major operating jurisdictions of Colorado, Minnesota, Texas, and Wisconsin, and various other state income-based tax returns.

 

In the first quarter of 2008, the IRS completed an examination of Xcel Energy’s federal income tax returns for 2004 and 2005 (and research credits for 2003). The IRS did not propose any material adjustments for those tax years. Tax year 2004 is the earliest open year and the statute of limitations applicable to Xcel Energy’s 2004 federal income tax return remains open until Dec. 31, 2008.

 

In the first quarter of 2008, the state of Minnesota concluded an income tax audit through tax year 2001 and the state of Texas concluded an audit through tax year 2005.  No material adjustments were proposed for these state audits. As of March 31, 2008, Xcel Energy’s earliest open tax years in which an audit can be initiated by state taxing authorities in its major operating jurisdictions are as follows: Colorado-2003, Minnesota-2003, Texas-2003 and Wisconsin-2002.

 

The amount of unrecognized tax benefits reported in continuing operations was $26.3 million on Dec. 31, 2007, and $26.1 million on March 31, 2008. The amount of unrecognized tax benefits reported in discontinued operations was $4.3 million on Dec. 31, 2007 and $4.3 million on March 31, 2008. These unrecognized tax benefit amounts were reduced by the tax benefits associated with net operating loss and tax credit carryovers reported in continuing operations of $7.8 million on Dec. 31, 2007 and $8.8 million on March 31, 2008 and net operating loss and tax credit carryovers reported in discontinued operations of $17.8 million on Dec. 31, 2007 and $18.3 million on March 31, 2008.

 

The unrecognized tax benefit balance reported in continuing operations included $9.8 million and $7.9 million of tax positions on Dec. 31, 2007 and March 31, 2008, respectively, which if recognized would affect the annual effective tax rate. In addition, the unrecognized tax benefit balance reported in continuing operations included $16.5 million and $18.2 million of tax positions on Dec. 31, 2007 and March 31, 2008, respectively, for which the ultimate deductibility is highly certain but for which there is uncertainty about the timing of such deductibility. A change in the period of deductibility would not affect the effective tax rate but would accelerate the payment of cash to the taxing authority to an earlier period.

 

The decrease in the unrecognized tax benefit balance reported in continuing operations of $0.2 million from Dec. 31, 2007 to March 31, 2008, was due to the resolution of certain federal and state audit matters, partially offset by the addition of similar uncertain tax positions related to ongoing activity. Xcel Energy's amount of unrecognized tax benefits for continuing operations could significantly change in the next 12 months when the IRS and state audits resume.  However, at this time, it is not reasonably possible to estimate an overall range of possible change.

 

The liability for interest related to unrecognized tax benefits is partially offset by the interest benefit associated with net operating loss and tax credit carryovers. The amount of interest income related to unrecognized tax benefits reported within interest charges in continuing operations in the first quarter of 2008 was $1.2 million. The liability for interest related to unrecognized tax benefits reported in continuing operations was $5.8 million on Dec. 31, 2007 and $4.6 million on March 31, 2008. The amount of interest income related to unrecognized tax benefits reported within interest charges in discontinued operations in the first quarter of 2008 was $0.2 million. The receivable for interest related to unrecognized tax benefits reported in discontinued operations was $0.5 million on Dec. 31, 2007 and $0.7 million on March 31, 2008.

 

No amounts were accrued for penalties in the first quarter of 2008.  The liability for penalties related to unrecognized tax benefits reported in continuing operations was $1.0 million on Dec. 31, 2007 and March 31, 2008.

 

The effective tax rate for continuing operations was 33.2 percent for the first quarter of 2008, compared with 28.8 percent for the same period in 2007.  The higher effective tax rate for first quarter 2008 was primarily due to an increase in the forecasted annual effective tax rate for 2008, compared with 2007, largely as a result of PSR Investments Inc. (PSRI) terminating the Corporate Owned Life Insurance (COLI) program in 2007.

 

6.     Rate Matters

 

Except to the extent noted below, the circumstances set forth in Note 14 to the consolidated financial statements included in Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2007 appropriately represent, in all material respects, the current status of other rate matters, and are incorporated herein by reference. The following include unresolved proceedings that are material to Xcel Energy’s financial position.

 

10



 

NSP-Minnesota

 

Pending and Recently Concluded Regulatory Proceedings — Minnesota Public Utilities Commission (MPUC)

 

Electric, Purchased Gas and Resource Adjustment Clauses

 

Transmission Cost Recovery (TCR) RiderIn November 2006, the MPUC approved a TCR rider pursuant to 2005 legislation. The TCR mechanism allows annual adjustments to retail electric rates to provide recovery of incremental transmission investments between rate cases.

 

·        In August 2007, NSP-Minnesota filed for approval of recovery of $19.7 million in Minnesota retail electric rates in 2008 under the TCR tariff.

·        In December 2007, NSP-Minnesota filed adjustments to these TCR rate factors and implemented adjustment factors set to recover $18.5 million beginning Jan. 1, 2008.  In March 2008, the MPUC issued an order approving the 2008 cost recovery (as modified), but requiring certain procedural changes for future TCR filings if costs are disputed.  NSP-Minnesota filed the required compliance filing in April 2008.

 

Renewable Energy Standard (RES) Rider — In June 2007, NSP-Minnesota filed an application for a new rate rider to recover the costs associated with utility-owned projects implemented in compliance with the RES adopted by the 2007 Minnesota legislature. The MPUC approved the RES Rider at its March 6, 2008, hearing, and it was implemented on April 1, 2008.  Under the rider, NSP-Minnesota could recover up to approximately $14.5 million in 2008 attributable to the Grand Meadow wind farm, a 100-megawatt (MW) wind project proposed by NSP-Minnesota, subject to true-up.

 

Annual Automatic Adjustment Report for 2007 — In September 2007, NSP-Minnesota filed its annual automatic adjustment reports for July 1, 2006 through June 30, 2007, which is the basis for the MPUC review of charges that flow through the fuel clause adjustment (FCA) and purchased gas adjustment (PGA) mechanisms. During that time period, $1.2 billion in fuel and purchased energy costs, including $384 million of Midwest Independent Transmission System Operator, Inc. (MISO) charges were recovered from electric customers through the FCA. In addition, approximately $590 million of purchased natural gas and transportation costs were recovered through the PGA. The 2007 annual automatic adjustment reports are pending comments and MPUC action.  The Minnesota Office of Energy Security (OES, formerly the Minnesota Department of Commerce) is expected to submit its reports to the MPUC by June 14, 2008.

 

Other

 

MISO Day 2 Market Cost Recovery — In December 2006, the MPUC issued an order ruling that NSP-Minnesota may recover all MISO Day 2 costs, except Schedules 16 and 17 administrative charges, through its fuel clause adjustment (FCA) effective April 1, 2005.

 

In April 2007, the Minnesota Office of Attorney General (MOAG) filed an appeal of the MPUC order to the Minnesota Court of Appeals (Court) challenging the MPUC’s decision to allow FCA recovery of these MISO charges. NSP-Minnesota and the other affected utilities intervened in the appeal and filed briefs urging the court to uphold the MPUC order. On April 15, 2008, the Court issued an opinion affirming the MPUC order.

 

Nuclear Refueling Outage Costs — In November 2007, NSP-Minnesota filed a request asking for a change in the recovery method for costs associated with refueling outages at its nuclear plants. The request seeks approval to amortize refueling outage costs over the period between refueling outages to better match revenue and expenses. This request, if approved, would reduce 2008 expenses for NSP-Minnesota jurisdiction by approximately $25 million due to deferral and amortization over an 18-month period versus expensed as incurred.  In March 2008, the OES issued comments indicating it did not object to adoption of the proposal, subject to conditions.  The MOAG filed comments opposing implementation of this change outside of a rate case.  Reply comments are expected to be filed in early May, and MPUC action is pending.

 

Pending Regulatory Proceedings — North Dakota Public Service Commission (NDPSC) and South Dakota Public Utilities Commission (SDPUC)

 

NSP-Minnesota North Dakota Electric Rate Case — In December 2007, NSP-Minnesota filed a request with the NDPSC to increase North Dakota retail electric rates by $20.5 million, or about 14 percent. The request was based on an 11.50 percent return on equity (ROE), an equity ratio of 51.77 percent, and a rate base of approximately $242 million. Interim rates of $17.2 million became effective in February 2008. NSP-Minnesota and the NDPSC staff reached a stipulation settlement in the rate case in which both parties recommended an ROE of 10.75 percent, with a sharing mechanism for earnings above

 

11



 

10.75 percent. This stipulation settlement is subject to approval by the NDPSC.  Hearings are expected to be held in late June, and final rates are expected to be effective Oct. 1, 2008.  The procedural schedule is as follows:

 

·

 

Intervenor testimony

 

May 9, 2008

·

 

Rebuttal testimony

 

June 13, 2008

·

 

Hearings

 

June-July, 2008

·

 

Order issued

 

Aug. 13, 2008

 

Nuclear Refueling Outage Costs In late 2007, NSP-Minnesota filed with both the NDPSC and SDPUC a request asking for a change in the recovery method for costs associated with refueling outages at its nuclear plants. The request is comparable to that filed with the MPUC.  In February 2008, the NDPSC approved the request, indicating that appropriate cost recovery levels would be determined in the pending electric rate case.  The SDPUC has not acted on the petition.

 

Pending and Recently Concluded Regulatory Proceedings — Federal Energy Regulatory Commission (FERC)

 

FERC Transmission Rate Case — The electric production and transmission system of NSP-Minnesota is managed as an integrated system with that of NSP-Wisconsin, jointly referred to as the NSP System.  In September 2007, Xcel Energy and MISO filed proposed changes to the MISO Transmission and Energy Markets Tariff (TEMT) to establish a revised formula transmission rate for the integrated NSP System. The rate filing would establish the transmission service rates for the NSP System based on annual forward looking (rather than historic) transmission costs; provide more current recovery of NSP System transmission investments and allow recovery of certain transmission incentives authorized by various FERC rules. A forward looking formula rate with a return on construction work in progress for major projects will facilitate the financing and construction of the new transmission facilities while providing a current return on invested capital for the portion of the investment subject to FERC rate jurisdiction. In December 2007, the FERC issued an order accepting the rate change effective Jan. 1, 2008, subject to Xcel Energy and MISO making certain changes to the procedures for pre-filing notice of the annual formula rate changes. No party filed for rehearing, and Xcel Energy submitted the required compliance filings.  Once the compliance filings are accepted, the rate case will be complete.  The rate change is expected to increase 2008 NSP System transmission revenues by approximately $2.7 million.

 

MISO Long-Term Transmission Pricing — In October 2005, MISO filed a proposed change to its Transmission and Energy Markets Tariff of MISO (TEMT) to regionalize future cost recovery of certain high voltage transmission projects to be constructed for reliability improvements. The tariff, called the Regional Expansion Criteria Benefits phase I (RECB I) and a subsequent proposal based on regional economic benefits (RECB II), would recover varying percentages of eligible reliability transmission costs from all transmission service customers in the MISO 15 state region. In November 2006, the FERC issued an order accepting the RECB I tariff, including the 20 percent limitation, which is the cap on the portion of transmission expansion costs that would be regionalized and recovered from all loads in the MISO region, with 80 percent allocated to the pricing zone where the transmission facilities are constructed.  In December 2006, the Public Service Commission of Wisconsin (PSCW) and other parties filed an appeal of the RECB I order to the U.S. federal Court of Appeals for the District of Columbia. The appeal is pending.

 

In March 2007, the FERC issued an order approving most aspects of the RECB II proposal. Transmission service rates in the MISO region presently use a rate design in which the transmission cost depends on the location of the load being served (referred to as “license plate” rates). Costs of existing transmission facilities are thus not regionalized. MISO and its transmission owners filed a successor rate methodology in August 2007, to be effective February 2008. Other entities sought to regionalize some of these costs. The impact of the regionalization of future facilities would depend on the specific facilities placed in service. In January 2008, the FERC issued an order accepting the MISO filing to continue use of license plate rates for existing facilities and RECB (limited regionalization) pricing for certain new facilities. The requests for rehearing are pending FERC action.

 

Revenue Sufficiency Guarantee Charges — In April 2006, the FERC issued an order determining that MISO had incorrectly applied its TEMT regarding the application of the revenue sufficiency guarantee (RSG) charge to certain transactions. The FERC ordered MISO to resettle all affected transactions retroactive to April 2005. The RSG charges are collected from MISO customers and paid to generators. In October 2006, the FERC issued an order granting rehearing in part and reversed the prior ruling requiring MISO to issue retroactive refunds and ordered MISO to submit a compliance filing to implement prospective changes.

 

In March 2007, the FERC issued orders separately denying rehearing of the October 2006 FERC order. Several parties have filed separate appeals to the D.C. Circuit Court seeking judicial review of the FERC’s determinations of the allocation of

 

12



 

RSG costs among MISO market participants. In 2007, several other utilities filed a complaint against MISO at the FERC, challenging the MISO’s current FERC-approved methodology for the recovery of RSG costs. In November 2007, the FERC issued an order that instituted a proceeding in these dockets to review evidence and to establish an RSG cost allocation methodology for market participants under the Midwest ISO Tariff. The refund-effective date established was Aug. 10, 2007. In March 2008, MISO filed revisions to its TEMT, reflecting an alternative mechanism for allocating RSG charges and costs. MISO stated that it included a real-time RSG cost allocation methodology, developed based on principles discussed in stakeholder discussions (but not yet conformed to incorporate new Ancillary Services Market (ASM) design elements). MISO stated that this new allocation methodology cannot be implemented prior to the start of the ASM and would be applied only prospectively.  These proceedings are pending at the FERC.

 

NSP-Wisconsin

 

Pending and Recently Concluded Regulatory Proceedings — PSCW

 

Base Rate

 

Electric and Gas Rate Case — In January 2008, the PSCW issued the final written order in NSP-Wisconsin’s 2008 test year rate case, approving an electric rate increase of approximately $39.4 million, or 8.1 percent, and a natural gas rate increase of $5.3 million, or 3.3 percent. The rate increase was based on a 10.75 percent ROE and a 52.5 percent common equity ratio. New rates went into effect Jan. 9, 2008.

 

Other

 

2008 Electric Fuel Cost Recovery — On April 7, 2008, NSP-Wisconsin filed an application with the PSCW requesting authorization to implement an electric fuel surcharge to increase electric rates by $19.7 million, or 3.8 percent, on an annual basis, with an effective date of May 1, 2008.  NSP-Wisconsin expects the PSCW to issue an order approving interim rates, subject to refund.  If the application is approved as filed, NSP-Wisconsin expects that the surcharge will generate approximately $13.2 million in additional revenue in 2008.  The surcharge was requested because fuel and purchased power costs, including replacement power costs associated with unplanned plant outages, are expected to be significantly higher than approved by the PSCW in NSP-Wisconsin’s 2008 rate case.

 

Financing Certificates of Authority In January 2008, NSP-Wisconsin filed an application with the PSCW for a certificate of authority to increase its previously approved short-term borrowing authority from $75 million to $150 million until such time NSP-Wisconsin completes its scheduled financing plan, at which time the authorization can decrease to $100 million; increase its short-term borrowing authority from NSP-Minnesota from $75 million to $150 million; and issue and sell up to $250 million aggregate principal amount of first mortgage bonds, debentures, notes, or other long-term indebtedness.  NSP-Wisconsin intends to use the proceeds of the long-term debt issuance to refinance or replace existing long-term debt totaling up to $145 million and use the remainder to repay outstanding short-term debt.  NSP-Wisconsin expects to issue long-term debt in 2008, but the exact timing and amount of the issuance will depend upon market conditions.  The PSCW issued a certificate of authority and orders approving NSP-Wisconsin’s short- and long-term financing applications in April 2008.

 

Bay Front Emission Controls Certificate of Authority In February 2008, NSP-Wisconsin filed an application with the PSCW seeking a certificate of authority to install equipment relating to combustion improvement and nitrogen oxide (NOx) emission controls in boilers 1 and 2 at the Bay Front power plant in Ashland County, Wisconsin.  In March 2008, the PSCW issued a certificate of authority and order approving the project.  Construction is expected to begin in May and is expected to be completed in the fall of 2008.

 

PSCo

 

Pending and Recently Concluded Regulatory Proceedings — Colorado Public Utilities Commission (CPUC)

 

Electric, Purchased Gas and Resource Adjustment Clauses

 

Transmission Cost Adjustment Rider — In September 2007, PSCo filed with the CPUC a request to implement a transmission cost adjustment rider (TCA), which would recover approximately $18.2 million in 2008. This filing is pursuant to recently enacted legislation, which entitled public utilities to recover, through a separate rate adjustment clause, the costs that it prudently incurs in planning, developing and completing the construction or expansion of transmission. This legislation

 

13



 

further encourages utilities to invest in transmission facilities by allowing the recovery of the total balance of construction work in progress related to those transmission investments.

 

In November 2007, PSCo updated its estimate of costs to be recovered through the TCA commencing Jan. 1, 2008, reducing its requested recovery during 2008 to $8.7 million.

 

In December 2007, the CPUC issued its initial decision approving PSCo’s application to implement the TCA. The CPUC limited the scope of the costs that could be recovered through the rider during 2008 to only those costs associated with transmission investment made after the new legislation authorizing the rider became effective on March 26, 2007. The CPUC also will require PSCo to base its revenue requirement calculation on a thirteen-month average net transmission plant balance. As a result of the CPUC’s decision, PSCo implemented a rider on Jan. 1, 2008, to recover approximately $4.5 million in 2008.

 

Enhanced Demand Side Management (DSM) Program — In October 2007, PSCo filed an application with the CPUC for approval to implement an expanded DSM program and to revise its DSM cost adjustment mechanism (DSMCA) to include current cost recovery and incentives designed to reward PSCo for successfully implementing cost-effective DSM programs and measures. With this application, PSCo proposes to expand and extend its commitment to acquire a cumulative level of 694 MW of peak demand reduction and 2,351 GWh of energy savings, including achievements associated with its existing DSM programs for 2009. Under the proposed revision to the DSMCA, PSCo would recover 100 percent of its forecasted expenses associated with the DSM program during the year in which the rider is in effect as well as an incentive based upon the net economic benefits achieved during the prior year up to 20 percent of the net present value of the benefits achieved.  PSCo filed rebuttal testimony in April 2008 agreeing with a CPUC staff recommendation to 100 percent lost margins plus an incentive of up to 10 percent of the net economic benefit.

 

Pending and Recently Concluded Regulatory Proceedings — FERC

 

Pacific Northwest FERC Refund Proceeding — In July 2001, the FERC ordered a preliminary hearing to determine whether there may have been unjust and unreasonable charges for spot market bilateral sales in the Pacific Northwest for the period Dec. 25, 2000 through June 20, 2001. PSCo supplied energy to the Pacific Northwest markets during this period and has been an active participant in the hearings. In September 2001, the presiding administrative law judge (ALJ) concluded that prices in the Pacific Northwest during the referenced period were the result of a number of factors, including the shortage of supply, excess demand, drought and increased natural gas prices. Under these circumstances, the ALJ concluded that the prices in the Pacific Northwest markets were not unreasonable or unjust and no refunds should be ordered. Subsequent to the ruling, the FERC has allowed the parties to request additional evidence regarding the use of certain strategies and how they may have impacted the markets in the Pacific Northwest markets. For the referenced period, parties have claimed that the total amount of transactions with PSCo subject to refund are $34 million. In June 2003, the FERC issued an order terminating the proceeding without ordering further proceedings. Certain purchasers filed appeals of the FERC’s orders in this proceeding with the U. S. Court of Appeals for the Ninth Circuit.

 

In an order issued in August 2007, the Ninth Circuit remanded the proceeding back to the FERC. The court of appeals preliminarily determined that it had jurisdiction to review the FERC’s decision not to order refunds and remanded the case back to the FERC, directing that the FERC consider evidence that had been presented regarding intentional market manipulation in the California markets and its potential ties to transactions in the Pacific Northwest. The court of appeals also indicated that the FERC should consider other rulings addressing overcharges in the California organized markets.  The FERC has yet to act on this order on remand.

 

PSCo Wholesale Rate Case — In February 2008, PSCo requested a $12.5 million increase, or a 5.88 percent in wholesale rates, based on 11.5 percent requested ROE.  The $12.5 million total increase was composed of  $8.8 million of traditional base rate recovery and $3.7 million of construction work in progress (CWIP) recovery for the Comanche 3 and Fort St. Vrain projects.   The increase is applicable to all wholesale firm service customers with the exception of Intermountain Rural Electric Cooperative, which is under a rate moratorium until January 2009.

 

In March 2008, PSCo reached an agreement with Holy Cross, Yampa Valley and Grand Valley (REA’s), which will resolve all issues based on a “black box” settlement with an implied ROE of 10.4 percent.  Parties filed the settlement with the FERC on April 17, 2008, with rates effective May 1, 2008.  PSCo has reached an agreement with the cities of Burlington and Center, as well as Aquila under the same substantive terms and conditions as the REA settlement, which was filed with the FERC on April 25, 2008.  The settlements provide for:

 

14



 

·    A traditional annual rate base rate increase of  $6.6 million with allowance for funds used during construction continuing for Comanche and Fort St. Vrain.

·    Implementation of new rates several months earlier than is typical in a disputed filing.

·    The ability to implement rates in PSCo’s next general rate case that will involve Comanche 3 costs upon a nominal suspension.

 

SPS

 

Pending and Recently Concluded Regulatory Proceedings — Public Utility Commission of Texas (PUCT)

 

Base Rate

 

Application to Increase Voltage-Level Line Loss Factors — In January 2008, the PUCT approved SPS’ application to update its current Texas retail fuel factors to reflect revised loss factors. Under the Texas retail base rate case, SPS was permitted to implement the revised line loss factors effective to May 2007. SPS recognized $6.2 million in the fourth quarter of 2007 for the impact of the revised line loss factors from May 1, 2007 through Dec. 31, 2007.

 

Electric and Resource Adjustment Clauses

 

TCR Factor Rulemaking — The PUCT adopted, in November 2007, new rules relating to TCR factor outside of a base rate case. The rule establishes the mechanism by which SPS can request annual recovery of its reasonable and necessary expenditures for transmission infrastructure improvement costs and changes in wholesale transmission charges that are not included in existing rates. This new rule allows SPS more timely recovery of transmission cost increases in-between base rate cases.

 

Pending and Recently Concluded Regulatory Proceedings — New Mexico Public Regulation Commission (NMPRC)

 

Base Rate

 

New Mexico Electric Rate Case — On July 30, 2007, SPS filed a request for a retail electric general rate increase of $17.3 million annually, or 6.6 percent, with the New Mexico Public Regulation Commission (NMPRC). The rate filing is based on 2006 historic test year adjusted for known and measurable changes and includes a requested ROE of 11.0 percent, an electric rate base of approximately $307.3 million and an equity ratio of 51.2 percent.

 

Following is a summary of intervenor and NMPRC staff testimony, which was filed on March 6, 2008:

 

·       NMPRC staff recommended an increase of approximately $8 million based on a 9.1 percent ROE and other adjustments.

·       The attorney general recommended a $2 million rate decrease based on a 9.2 percent ROE and other adjustments.

·       Occidental Permian, a large retail customer, recommended a 9.9 percent ROE.

 

Hearings were held in April 2008.  At the close of the hearings, the parties agreed to move consideration of the Lea Power Partners (Lea Power) rider costs to a future rate proceeding to be initiated by Xcel Energy this summer, which will be accompanied with a request for interim relief, so that issues associated with lease accounting and potential contract restructuring, discussed in the Management’s Discussion and Analysis section of this report, may be adequately addressed.  The remaining procedural schedule is as follows:

 

·

 

Recommend decision

 

June 30, 2008

·

 

Final order

 

Aug. 29, 2008

 

Electric and Resource Adjustment Clauses

 

New Mexico Fuel Factor Continuation Filing — In August 2005, SPS filed with the NMPRC requesting continuation of the use of SPS’ fuel and purchased power cost adjustment clause (FPPCAC) and current monthly factor cost recovery methodology. This filing was required by NMPRC rule.

 

Testimony was filed in the case by staff and intervenors objecting to SPS’ assignment of system average fuel costs to certain wholesale sales and the inclusion of certain purchased power capacity and energy payments in the FPPCAC. The testimony also proposed limits on SPS’ future use of the FPPCAC. Related to these issues, some intervenors requested disallowances

 

15



 

for past periods, which in the aggregate total approximately $45 million. This claim was for the period from Oct. 1, 2001 through May 31, 2005 and does not include the value of incremental cost assigned for wholesale transactions from that date forward. Other issues in the case include the treatment of renewable energy certificates and sulfur dioxide (SO2) allowance credit proceeds in relation to SPS’ New Mexico retail fuel and purchased power recovery clause.

 

In December 2007, SPS, the NMPRC, Occidental Permian Ltd. and the New Mexico Industrial Energy Consumers (NMIEC) filed an uncontested settlement of this matter with the NMPRC.

 

·      The settlement resolves all issues in the fuel continuation proceeding for total consideration of $15 million, which includes customer refunds of $11.7 million.

·      At Dec. 31, 2007, a reserve had been previously established for this potential exposure, with no further expense accrual required, assuming this settlement is approved.

·      The settlement would also provide for significantly greater certainty surrounding system average fuel cost assignment on a going forward basis and reduce percentages of system average cost wholesale sales between now and 2019 on a stepped down basis.

·      Under the terms of the settlement, SPS anticipates additional fuel cost disallowances in 2008 and a portion of 2009 of approximately $2 million per year. It does not anticipate any future disallowances beyond this period.

·      Finally, the settlement provides for SPS to continue its use of the FPPCAC subject to additional reporting provisions.

 

A hearing on the merits of the settlement was held in April 2008.  The parties are to provide the hearing examiner with a proposed certification of the settlement on May 2, 2008, which will recommend approval of the settlement.  Any objections to the proposed certification are due on May 9, 2008.

 

Pending and Recently Concluded Regulatory Proceedings — FERC

 

Wholesale Rate Complaints — In November 2004, Golden Spread Electric, Lyntegar Electric, Farmer’s Electric, Lea County Electric, Central Valley Electric and Roosevelt County Electric, all wholesale cooperative customers of SPS, filed a rate complaint with the FERC alleging that SPS’ rates to them for wholesale service were excessive and that SPS had incorrectly calculated monthly fuel cost adjustment charges to such customers  (the Complaint). Among other things, the complainant asserted that SPS had inappropriately allocated average fuel and purchased power costs to other wholesale customers, effectively raising the fuel cost charges to complainants. Cap Rock Energy Corporation (Cap Rock), another full-requirements customer of SPS, Public Service Company of New Mexico (PNM) and Occidental Permian Ltd. and Occidental Power Marketing, L.P. (Occidental), SPS’ largest retail customer, intervened in the proceeding.

 

In May 2006, a FERC administrative law judge (ALJ) issued an initial decision in the proceeding. The ALJ found that SPS should recalculate its wholesale fuel and purchased economic energy cost adjustment clause (FCAC) billings for the period beginning Jan. 1, 1999, to reduce the fuel and purchased power costs recovered from the complaining customers by deducting from such costs the  incremental fuel costs attributed to  SPS’ sales of system firm capacity and associated energy to other wholesale customers served under market-based rates during this period based on the view that such sales should be treated as opportunity sales made out of temporarily excess capacity. In addition, the ALJ made recommendations on a number of base rate issues including a 9.64 percent ROE and the use of a 3-month coincident peak (3CP) demand allocator.

 

Golden Spread Complaint Settlement  In December 2007, SPS reached a settlement with Golden Spread (which now includes Lyntegar Electric) and Occidental regarding base rate and fuel issues raised in the complaint described above as well as a subsequent rate proceeding. In December 2007, this comprehensive offer of settlement (the Settlement) was filed with the FERC. On April 21, 2008, the FERC approved the Settlement with a minor modification to the formula rate proposed by the FERC and accepted by the parties.  The Settlement provides for:

 

·     A $1.25 million payment by SPS to Golden Spread related to resolve a dispute concerning  the quantities Golden Spread was entitled to take under its existing partial requirements agreement for the years 2006 and 2007. The Settlement caps those quantities for the period 2008 through 2011. SPS is not required to make any fuel refunds to Golden Spread that were the subject of the Complaint under the terms of the Settlement.

 

·     An extended partial requirements contract at system average cost, with a capacity amount that ramps down over the period 2012 through 2019 from 500 MW to 200 MW. The extended agreement requires that the cost assignment treatment receive Texas and New Mexico state approvals and provides for alternative pricing terms and quantities to hold SPS harmless from cost disallowances in the event that adverse regulatory treatment occurs or state approvals are not obtained. Golden Spread agreed to hold SPS harmless from any future adverse regulatory treatment regarding the proposed sale and SPS agreed to contingent payments ranging from $3 million to a maximum of $12 million, payable in 2012, in the event that there is an adverse cost assignment decision or a failure to obtain state approvals.

 

16



 

·      Resolution of base rates in the Complaint without any adjustment to the existing rates for the period January 2005 through June 30, 2006. The Settlement also resolves all base rate issues in SPS’ subsequent proceeding related to the period July 1, 2006 through June 30, 2008, other than the method to be used to allocate demand related costs and provided for two sets of agreed on rates that are dependent on the ultimate resolution of that issue. If SPS prevails in its support of the 12 month coincident peak (12 CP) demand allocation method, there would be no impact to earnings for this period. If Golden Spread prevails, SPS would be required to refund Golden Spread and PNM approximately $4 million for the period through the end of 2007.

 

·      For July 1, 2008 and beyond, Golden Spread will be under a formula rate for power supply service. The rate will be based on actual data the most recent historic year adjusted for known and measurable changes and trued up to the actual performance in the subsequent calendar year. Initially, the formula will be based on a 10.25 percent ROE and either party will have a right to seek changes to the ROE beginning with the 2009 formula rate filing. SPS and Golden Spread will share margins from its sales to West Texas Municipal Power Agency (WTMPA) and El Paso Electric (EPE) in that year but will assign system average fuel and energy costs to those agreements for purposes of calculating Golden Spread’s monthly fuel cost.

 

Order on Wholesale Rate Complaints On April 21, 2008, the FERC issued its Order on the Complaint (the Order) applied to the remaining non-settling parties.  The Order addresses base rate issues for the period from Jan. 1, 2005 through June 30, 2006 for SPS’ full requirements customers who pay traditional cost-based rates and requires certain refunds.

 

Base Rates:  The FERC determined: (1) the return on equity should be 9.33 percent; (2) rates should be based on a 12 CP allocator; and (3) the treatment of market based rate contracts in the test year should be to credit revenues to the cost of service rather than allocating costs to the agreements. The revenue requirement established by the FERC results in proposed revenues that are estimated to be approximately $25 million, or approximately $6.9 million below the level charged these customers during this 18-month period. Rates for full requirements customers, the New Mexico Cooperatives and Cap Rock, as well as an interruptible contract with PNM for the period beginning in July 1, 2006, are the subject of settlements that have either been approved or are pending before FERC.  These settlements are described in Wholesale 2005 Power Base Rate Application below.

 

Fuel Clause:  The FERC determined that the method for calculating fuel and purchased energy cost charges to the complaining customer is to deduct from such costs incremental fuel and purchased energy costs, which it is attributing to SPS’ market based intersystem sales on the basis that these are “opportunity” sales under its precedent.  The FERC ordered that refunds of fuel cost charges based on this method of determining the FCAC should begin as of Jan. 1, 2005 (the refund effective date in the case).  The FERC ordered SPS to file a compliance filing calculating its refund obligation within 30 days of the date of the Order and implement the instructions in the order in calculating its FCAC charges going forward from that date.  While the order is subject to interpretation with respect to aspects of the calculation of the refund obligation, SPS does not expect its refund obligation to its full requirements customers from Jan. 1, 2005 through March 31, 2008, to exceed $11 million. PNM has filed a separate complaint any refund obligation to PNM will be determined in that docket.  SPS is reviewing the Order and has not yet determined whether to seek rehearing.

 

The FERC also ruled on two other FCA issues.  First, it required that wind contracts be evaluated on an individual contract basis rather than in aggregate.  Second, the FERC determined that an after the fact screen should be applied to all Qualifying Facility (QF) purchases to determine if they are economic.  While this review will require additional effort, it is not expected that this will result in additional refunds as the all of the individual wind contracts as well as the QF purchases are typically economic when compared to market energy prices.

 

As of March 31, 2008, SPS has accrued an amount, sufficient to cover the refund obligation.

 

Wholesale 2005 Power Base Rate Application — In December 2005, SPS filed for a $2.5 million increase in wholesale power rates to certain electric cooperatives. In January 2006, the FERC conditionally accepted the proposed rates for filing and the $2.5 million power rate increase became effective on July 1, 2006, subject to refund. The FERC also set the rate increase request for hearing and settlement judge procedures. In September 2006, offers of settlement with respect to the five full-requirements customers and with respect to PNM were filed for approval. In September 2007, the FERC accepted the settlement with the full-requirements customers. The PNM settlement is still pending before the FERC.

 

As noted, the Wholesale 2005 Power Base Rate Application relating to Golden Spread was settled in conjunction with the Complaint Settlement discussed above. Therefore, SPS has settled with all parties in the Wholesale 2005 Power Base Rate

 

17



 

Application except for resolution with Golden Spread of the demand cost allocation methodology.  A hearing on the demand allocation methodology has been set for July 29, 2008.  An Initial Decision expected by the end of September 2008.

 

SPS Formula Transmission Rate Case — In December 2007, Xcel Energy submitted an application to implement a transmission formula rate for the SPS zone of the Xcel Energy Open Access Transmission Tariff (OATT). The Southwest Power Pool Inc. (SPP) made a companion filing in January 2008, to implement the same pricing in the SPS zone of the SPP regional OATT. The changed rates will affect all wholesale transmission service customers using the SPS transmission network under either the SPP Regional OATT or the Xcel Energy OATT.

 

A formula rate will help facilitate the financing and construction of the new transmission facilities while providing an adequate rate of return on invested capital. The proposed rates would be updated annually each July 1 based on SPS’ prior year actual costs and loads plus the revenue requirements associated with projected current year transmission plant additions. The proposed rate of return on common equity is 12.7 percent, including a 50 basis point adder for SPS’ participation in the SPP Regional Transmission Organization, consistent with FERC precedent. The proposed rates would provide first year incremental annual transmission revenue for SPS of approximately $5.5 million.

 

In February 2008, the FERC issued an order accepting the proposed rates, suspending the effective date to July 6, 2008, and setting the rate filing for hearings and settlement procedures. The FERC granted a 50 basis point adder to the ROE that it will determine in this proceeding as a result of SPS’ participation in the SPP regional transmission organization. In March 2008, the FERC accepted the companion SPP rate change filing subject to the outcome of the SPS rate filing. The SPS and SPP rate filings are now in settlement procedures.  The ultimate outcome of the rate filings is not known at this time.

 

SPS 2008 Wholesale Rate Case — On March 31, 2008, SPS filed a wholesale power base rate case in the full-requirements customers’ base rates. SPS is seeking an annual revenue increase of $14.9 million or an overall 5.14 percent increase, based on 12.20 percent requested ROE. On April 21, 2008, a motion for dismissal and protest was filed by the four eastern New Mexico cooperatives. A FERC decision is expected later in 2008.

 

7.     Commitments and Contingent Liabilities

 

Except to the extent noted below, the circumstances set forth in Notes 14, 15 and 16 to the consolidated financial statements included in Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2007, and Note 6 to the consolidated financial statements in this Quarterly Report on Form 10-Q appropriately represent, in all material respects, the current status of other commitments and contingent liabilities, including those regarding public liability for claims resulting from any nuclear incident, and are incorporated herein by reference. The following include unresolved contingencies that are material to Xcel Energy’s financial position.

 

Environmental Contingencies

 

Xcel Energy and its subsidiaries have been, or are currently involved with, the cleanup of contamination from certain hazardous substances at several sites. In many situations, the subsidiary involved believes it will recover some portion of these costs through insurance claims. Additionally, where applicable, the subsidiary involved is pursuing, or intends to pursue, recovery from other potentially responsible parties and through the rate regulatory process. New and changing federal and state environmental mandates can also create added financial liabilities for Xcel Energy and its subsidiaries, which are normally recovered through the rate regulatory process. To the extent any costs are not recovered through the options listed above, Xcel Energy would be required to recognize an expense.

 

Site Remediation — Xcel Energy must pay all or a portion of the cost to remediate sites where past activities of its subsidiaries and some other parties have caused environmental contamination. Environmental contingencies could arise from various situations, including the following categories of sites:

 

·     Sites of former manufactured gas plants (MGPs) operated by Xcel Energy subsidiaries, predecessors, or other entities; and

·     Third-party sites, such as landfills, to which Xcel Energy is alleged to be a potentially responsible party (PRP) that sent hazardous materials and wastes.

 

Xcel Energy records a liability when enough information is obtained to develop an estimate of the cost of environmental remediation and revises the estimate as information is received. The estimated remediation cost may vary materially from the initial estimate.

 

18



 

To estimate the remediation cost for these sites, assumptions are made when facts are not fully known. For instance, assumptions may be made about the nature and extent of site contamination, the extent of required cleanup efforts, costs of alternative cleanup methods and pollution-control technologies, the period over which remediation will be performed and paid for, changes in environmental remediation and pollution-control requirements, the potential effect of technological improvements, the number and financial strength of other PRPs and the identification of new environmental cleanup sites.

 

Estimates are revised as facts become known. At March 31, 2008, the liability for the cost of remediating these sites was estimated to be $46.7 million, of which $2.4 million was considered to be a current liability. Some of the cost of remediation may be recovered from:

 

·     Insurance coverage;

·     Other parties that have contributed to the contamination; and

·     Customers.

 

Neither the total remediation cost nor the final method of cost allocation among all PRPs of the unremediated sites has been determined. Estimates have been recorded for Xcel Energy’s future costs for these sites.

 

Manufactured Gas Plant Sites

 

Ashland Manufactured Gas Plant Site — NSP-Wisconsin was named a PRP for creosote and coal tar contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (Ashland site) includes property owned by NSP-Wisconsin, which was previously an MGP facility and two other properties: an adjacent city lakeshore park area, on which an unaffiliated third party previously operated a sawmill, and an area of Lake Superior’s Chequemegon Bay adjoining the park.

 

In September 2002, the Ashland site was placed on the National Priorities List. A determination of the scope and cost of the remediation of the Ashland site is not currently expected until early 2009. NSP-Wisconsin continues to work with the Wisconsin Department of Natural Resources (WDNR) to access state and federal funds to apply to the ultimate remediation cost of the entire site.

 

In November 2005, the Environmental Protection Agency (EPA) Superfund Innovative Technology Evaluation Program (SITE) Program accepted the Ashland site into its program. As part of the SITE program, NSP-Wisconsin proposed and the EPA accepted a site demonstration of an in situ, chemical oxidation technique to treat upland ground water and contaminated soil. The fieldwork for the demonstration study was completed in February 2007. In 2007, NSP-Wisconsin spent $1.5 million in the development of the work plan, the operation of the existing interim response action and other matters related to the site. In June 2007, the EPA modified its remedial investigation report to establish final remedial action objectives (RAOs) and preliminary remediation goals (PRGs) for the Ashland site. The RAOs and PRGs could potentially impact the development and evaluation of remedial options for ultimate site cleanup. In September 2007, the EPA approved the series of reports included in the remedial investigation (RI) report. The draft feasibility study, which develops and assesses the alternatives for cleaning up the site, was prepared by NSP-Wisconsin and was submitted to the EPA in October 2007. The range of remediation costs set forth in the draft feasibility study is between $35.8 million and $125.5 million. In February 2008, the EPA provided written comments on the October 2007 draft feasibility study submitted by NSP-Wisconsin.  NSP-Wisconsin has until May 15, 2008 to submit a revised draft feasibility study based upon the EPA’s comments.

 

In October 2004, the WDNR filed a lawsuit in Wisconsin state court for reimbursement of past oversight costs incurred at the Ashland site between 1994 and March 2003 in the approximate amount of $1.4 million. The lawsuit has been stayed. NSP-Wisconsin has recorded an estimate of its potential liability. All costs paid to the WDNR are expected to be recoverable in rates.

 

In addition to potential liability for remediation and WDNR oversight costs, NSP-Wisconsin may also have liability for natural resource damages (NRD) at the Ashland site. NSP-Wisconsin has indicated to the relevant natural resource trustees its interest in engaging in discussions concerning the assessment of natural resources injuries and in proposing various restoration projects in an effort to fully and finally resolve all NRD claims. NSP-Wisconsin is not able to estimate its potential exposure for NRD at the site, but has recorded an estimate of its potential liability based upon the minimum of its estimated range of potential exposure.

 

Until the EPA and the WDNR select a remediation strategy for the entire site and determine NSP-Wisconsin’s level of responsibility, NSP-Wisconsin’s liability for the actual cost of remediating the Ashland site and the time frame over which the amounts may be paid out are not determinable. Since NSP-Wisconsin cannot currently estimate the cost of remediating the Ashland site, that portion of the recorded liability related to remediation is based upon the minimum of the estimated

 

19



 

range of remediation costs, contained in the draft feasibility study. NSP-Wisconsin has recorded a liability of $43.6 million for its potential liability related to the Ashland site, including potential liability for remediation of the Ashland site, WDNR oversight costs, NRD claims, outside legal and consultant costs and work plan costs.

 

NSP-Wisconsin has deferred, as a regulatory asset, the costs accrued for the Ashland site based on an expectation that the PSCW will continue to allow NSP-Wisconsin to recover payments for MGP-related environmental remediation from its customers. The PSCW has consistently authorized recovery in NSP-Wisconsin rates of all remediation costs incurred at the Ashland site and has authorized recovery of similar remediation costs for other Wisconsin utilities. External MGP remediation costs are subject to deferral in the Wisconsin retail jurisdiction and are reviewed for prudence as part of the Wisconsin biennial retail rate case process.

 

In addition, in 2003, the Wisconsin Supreme Court rendered a ruling that reopens the possibility that NSP-Wisconsin may be able to recover a portion of the remediation costs from its insurance carriers. Any insurance proceeds received by NSP-Wisconsin will be credited to ratepayers.

 

Fort Collins Manufactured Gas Plant Site — Prior to 1926, the Poudre Valley Gas Co. operated an MGP in Fort Collins, Colo., not far from the Cache la Poudre River. In 1926, after acquiring the assets of the Poudre Valley Gas Co., PSCo shut down the MGP site and has subsequently sold most of the property. In 2002, an oily substance similar to MGP byproducts was discovered in the Cache la Poudre River. In November 2004, PSCo entered into an agreement with the EPA, the city of Fort Collins and Schrader Oil Co. (Schrader) under which PSCo performed remediation and monitoring work. PSCo has substantially completed work at the site, with the exception of ongoing maintenance and monitoring.

 

In November 2006, PSCo filed a natural gas rate case with the CPUC requesting recovery of additional clean-up costs at the Fort Collins MGP site spent through September 2006, plus unrecovered amounts previously authorized from the last rate case, which amounted to $10.8 million to be amortized over four years. In June 2007, PSCo entered into a settlement agreement that included recovery of the full $10.8 million, but with a five-year amortization period. The CPUC approved the agreement on June 18, 2007. The total amount to be recovered from customers is $13.1 million. Estimated future project costs, based upon an assumed 30-year system operating life, including EPA oversight costs, are approximately $3.9 million.

 

In April 2005, PSCo brought a contribution action against Schrader and related parties alleging Schrader released hazardous substances into the environment and these releases caused MGP byproducts to migrate to the Cache la Poudre River, thereby substantially increasing the scope and cost of remediation. PSCo requested damages, including a portion of the costs PSCo incurred to investigate and remove contaminated sediments from the Cache la Poudre River. In December 2005, the court denied Schrader’s request to dismiss the PSCo suit. Schrader thereafter filed a response to the PSCo complaint and a counterclaim against PSCo for its response costs under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and under the Resource Conservation and Recovery Act (RCRA). Schrader alleged as part of its counterclaim an “imminent and substantial endangerment” of its property as defined by RCRA. PSCo filed a motion for partial summary judgment to dismiss Schrader’s RCRA claim. In October 2007, the court granted PSCo’s motion for partial summary judgment and dismissed Schrader’s RCRA claim. Schrader also filed a motion for summary judgment seeking to dismiss PSCo’s CERCLA claim.   In April 2008, the court denied Schrader’s motion for summary judgment and scheduled the case for a September 2008 trial.  Any costs recovered from Schrader are expected to credit ratepayers.

 

Third Party and Other Environmental Site Remediation

 

Asbestos Removal — Some of our facilities contain asbestos. Most asbestos will remain undisturbed until the facilities that contain it are demolished or renovated. Xcel Energy has recorded an estimate for final removal of the asbestos as an asset retirement obligation.

 

See additional discussion of asset retirement obligations in Note 15 of the Xcel Energy Annual Report on Form 10-K for the year ended Dec. 31, 2007. It may be necessary to remove some asbestos to perform maintenance or make improvements to other equipment. The cost of removing asbestos as part of other work is immaterial and is recorded as incurred as operating expenses for maintenance projects, capital expenditures for construction projects or removal costs for demolition projects.

 

20



 

Other Environmental Requirements

 

Clean Air Interstate Rule — In March 2005, the EPA issued the Clean Air Interstate Rule (CAIR) to further regulate SO2 and nitrogen oxide (NOx) emissions. The objective of CAIR is to cap emissions of SO2 and NOx in the eastern United States, including Minnesota, Texas and Wisconsin, which are within Xcel Energy’s service territory. Xcel Energy generating facilities in other states are not affected. CAIR addresses the transportation of fine particulates, ozone and emission precursors to nonattainment downwind states. CAIR has a two-phase compliance schedule, beginning in 2009 for NOx and 2010 for SO2, with a final compliance deadline in 2015 for both emissions. Under CAIR, each affected state will be allocated an emissions budget for SO2 and NOx that will result in significant emission reductions. It will be based on stringent emission controls and forms the basis for a cap-and-trade program. State emission budgets or caps decline over time. States can choose to implement an emissions reduction program based on the EPA’s proposed model program, or they can propose another method, which the EPA would need to approve.

 

In July 2005, SPS, the City of Amarillo, Texas and Occidental Permian LTD filed a lawsuit against the EPA and a request for reconsideration with the agency to exclude West Texas from the CAIR. El Paso Electric Co. joined in the request for reconsideration. Xcel Energy and SPS advocated that West Texas should be excluded from CAIR because it does not contribute significantly to nonattainment with the fine particulate matter standards in any downwind jurisdiction.

 

In March 2006, the EPA denied the petition for reconsideration and in June 2006, Xcel Energy and the other parties filed a petition for review of the denial of the petition for reconsideration, as well as a petition for review of the Federal Implementation Plan, with the D.C. Circuit Court of Appeals.  The Court has taken this matter under advisement and a decision is expected in due course.

 

Under CAIR’s cap-and-trade structure, SPS can comply through capital investments in emission controls or purchase of emission “allowances” from other utilities making reductions on their systems. Based on the preliminary analysis of various scenarios of capital investment and allowance purchase, Xcel Energy currently believes that after the installation of low NOx burners on Harrington 3 in 2006, the remaining capital investments for NOx controls in the SPS region are estimated at $12 million. Purchases of NOx allowances are estimated at $2.1 million in 2009 with no NOx allowance needs in 2010.   Annual purchases of SO2 allowances are estimated in the range of $5 million to $25 million each year, beginning in 2012, for phase I, based on allowance costs and fuel quality as of March 2007. These cost estimates represent one potential scenario on complying with CAIR, if West Texas is not excluded.

 

In addition, Minnesota and Wisconsin will be included in CAIR, and Xcel Energy has generating facilities in these states that will be impacted. Preliminary estimates of capital expenditures associated with compliance with CAIR in Minnesota and Wisconsin range from $30 million to $40 million. Xcel Energy is not challenging CAIR in these states.  Purchases of NOx allowances for NSP-Minnesota in 2009 are estimated at $9.2 million in 2009 with no NOx allowance needs in 2010.  For NSP-Wisconsin, purchases of CAIR NOx allowances are estimated at $2.4 million in 2009 and $2.1 million in 2010.

 

While Xcel Energy expects to comply with the new rules through a combination of additional capital investments in emission controls at various facilities and purchases of emission allowances, it is continuing to review the alternatives. Xcel Energy believes the cost of any required capital investment or allowance purchases will be recoverable from customers in rates.

 

Clean Air Mercury Rule — In March 2005, the EPA issued the Clean Air Mercury Rule (CAMR), which regulated mercury emissions from power plants. On Feb. 8, 2008, the D.C. Circuit Court of Appeals vacated CAMR, which impacts federal CAMR requirements, but not necessarily state-only mercury legislation and rules. Costs to comply with the Minnesota Mercury Emissions Reduction Act of 2006 are discussed below.

 

In Colorado, the Air Quality Control Commission passed a mercury rule, which requires mercury emission controls capable of achieving 80 percent capture to be installed at the Pawnee Generating Station by 2012 and all other Colorado units by 2014. Xcel Energy is in the process of installing mercury monitors on seven Colorado units at an estimated aggregate cost of approximately $2.6 million. Xcel Energy is evaluating the emission controls required to meet the state rule and is currently unable to provide a capital cost estimate.

 

In the SPS region, the Texas Commission on Environmental Quality (TCEQ) adopted by reference the EPA model program.  Given the many uncertainties created by the decision of the D.C. Circuit Court of Appeals to vacate CAMR, it is not possible at this time to provide an accurate summary of applicable federal mercury requirements or cost estimates.

 

Minnesota Mercury Legislation — In May 2006, the Minnesota legislature enacted the Mercury Emissions Reduction Act of 2006 (Act) providing a process for plans, implementation and cost recovery for utility efforts to curb mercury emissions at

 

21



 

certain power plants. For Xcel Energy, the Act covers units at the A. S. King and Sherco generating facilities. Under the Act, Xcel Energy is operating and maintaining continuous mercury emission monitoring systems. The information obtained will be used to establish a baseline from which to measure mercury emission reductions. Mercury emission reduction plans were required to be filed by utilities by Dec. 31, 2007 (dry scrubbed units) and Dec. 31, 2009 (wet scrubbed units) that propose to implement technologies most likely to reduce emissions by 90 percent. Implementation would occur by Dec. 31, 2009 for one of the dry scrubbed units, Dec. 31, 2010 for the remaining dry scrubbed unit and Dec. 31, 2014 for wet scrubbed units. The cost of controls will be determined as part of the engineering analysis portion of the mercury reduction plans and is currently estimated to range from $26.5 to $854.5 million for the mercury control and continuous monitoring equipment for Sherco units 1, 2 and 3 and for A.S. King, with increased operating and maintenance expenses estimated to range from approximately $24.7 to $77.2 million. The lower values include costs to achieve a 50 percent mercury reduction for Sherco units 1 and 2 and a 90 percent mercury reduction for Sherco unit 3 and A. S. King. The higher values include costs to achieve a 90 percent mercury reduction for all Sherco units, as well as for A. S. King. Utilities subject to the Act may also submit plans to address non-mercury pollutants subject to federal and state statutes and regulations, which became effective after Dec. 31, 2004. Cost recovery provisions of the Act also apply to these other environmental initiatives. In September 2006, NSP-Minnesota filed a request with the MPUC for recovery of up to $6.3 million of certain environmental improvement costs that are expected to be recoverable under the Act. In January 2007, the MPUC approved this request to defer these costs as a regulatory asset with a cap of $6.3 million. To date, NSP-Minnesota has spent approximately $1.3 million on mercury monitoring implementation.

 

Voluntary Capacity Upgrade and Emissions Reduction Filing — In December 2007, NSP-Minnesota filed a plan with the MPCA and MPUC for reducing mercury emissions by up to 90 percent at the Sherco unit 3 and King plants.  Estimated project costs amount to approximately $9.1 million.  At the same time, NSP-Minnesota submitted a revised filing to the MPUC for a major emissions reduction project at Sherco Units 1 and 2 to reduce emissions and expand capacity.  The revised filing has estimated project costs of approximately $1.1 billion and encompasses the higher value mercury control costs discussed above in the Minnesota Mercury Legislation section. The filing also contains alternatives for the MPUC to consider to add additional capacity and to achieve even lower emissions.  If selected, these alternatives could range from $90.8 to $330.8 million in addition to the $1.1 billion proposal.  NSP-Minnesota’s investments are subject to MPUC approval of a cost recovery mechanism.

 

Regional Haze Rules — In June 2005, the EPA finalized amendments to the July 1999 regional haze rules. These amendments apply to the provisions of the regional haze rule that require emission controls, known as best available retrofit technology (BART), for industrial facilities emitting air pollutants that reduce visibility by causing or contributing to regional haze. Xcel Energy generating facilities in several states will be subject to BART requirements. Some of these facilities are located in regions where CAIR is effective. CAIR has precedence over BART. Therefore, BART requirements will be deemed to be met through compliance with CAIR requirements.

 

The EPA required states to develop implementation plans to comply with BART by December 2007. States are required to identify the facilities that will have to reduce SO2, NOx, and particulate matter emissions under BART and then set BART emissions limits for those facilities. In May 2006, the Colorado Air Quality Control Commission (AQCC) promulgated BART regulations requiring certain major stationary sources to evaluate and install, operate and maintain BART or an approved BART alternative to make reasonable progress toward meeting the national visibility goal. PSCo estimates that implementation of the BART alternatives will cost approximately $211 million in capital costs, which includes approximately $62 million in environmental upgrades for the existing Comanche Station project, which are included in the capital budget. PSCo expects the cost of any required capital investment will be recoverable from customers. Emissions controls are expected to be installed between 2011 and 2014. On June 4, 2007, the Colorado Air Pollution Control Division (CAPCD) approved PSCo’s BART analysis and obtained public comment on its BART determination and PSCo’s BART permits. The AQCC approved the CAPCD’s BART determination for PSCo during a public hearing in December 2007. CAPCD’s BART determinations and corresponding provisions of the regional haze state implementation plan will be submitted to the EPA for approval in 2008. In addition, in early 2008, the CAPCD initiated a stakeholder process to establish reasonable progress goals for Colorado’s Class I areas. To meet these goals, more controls may be required from certain sources, which may or may not include those sources previously controlled under BART.

 

NSP-Minnesota submitted its BART alternatives analysis for Sherco units 1 and 2 in October 2006. The Minnesota Pollution Control Agency (MPCA) reviewed the BART analyses for all units in Minnesota and determined that overall, compliance with CAIR is better than BART. At this time, the MPCA is not requiring any BART specific controls that go beyond controls required for CAIR compliance.

 

Federal Clean Water Act — The federal Clean Water Act requires the EPA to regulate cooling water intake structures to assure that these structures reflect the “best technology available” for minimizing adverse environmental impacts. In July 

 

22



 

2004, the EPA published phase II of the rule, which applies to existing cooling water intakes at steam-electric power plants. Several lawsuits were filed against the EPA in the United States Court of Appeals for the Second Circuit challenging the phase II rulemaking. In January 2007, the court issued its decision and remanded virtually every aspect of the rule to the EPA for reconsideration. In June 2007, the EPA suspended the deadlines and referred any implementation to each state’s best professional judgment until the EPA is able to fully respond to the court-ordered remand. As a result, the rule’s compliance requirements and associated deadlines are currently unknown. It is not possible to provide an accurate estimate of the overall cost of this rulemaking at this time due to the many uncertainties involved.

 

Maddox Station Groundwater — The New Mexico Environment Department (NMED) is requiring wastewater activity at Maddox Station to be permitted. SPS is developing the permit application and engineering wastewater management facilities. The estimated cost of the project is $1.8 million with an anticipated completion date in the third quarter of 2009.

 

New York Office of the Attorney General Subpoena — In September 2007, the Office of the New York Attorney General (NYAG) issued a subpoena pursuant to the Martin Act, a New York statute, to Xcel Energy. The subpoena seeks information and documents related to Xcel Energy’s analysis of risks posed by climate change and possible climate legislation and its disclosures of such risks to investors. In a letter accompanying the subpoena, the NYAG asserts that the increase in carbon dioxide (CO2) emissions upon completion of Comanche 3 (a coal-fired unit), “in combination with Xcel Energy’s other coal-fired plants, will subject Xcel to increased financial, regulatory and litigation risks” which need to be disclosed to shareholders. Xcel Energy believes it has fully disclosed these risks, to the extent they can be ascertained, and such disclosures belie the concerns expressed by the NYAG.

 

PSCo Notice of Violation — In July 2002, PSCo received a Notice of Violation (NOV) from the EPA alleging violations of the New Source Review (NSR) requirements of the Clean Air Act (CAA) at the Comanche and Pawnee plants in Colorado. The NOV specifically alleges that various maintenance, repair and replacement projects undertaken at the plants in the mid- to late-1990s should have required a permit under the NSR process. PSCo believes it has acted in full compliance with the CAA and NSR process. It believes that the projects identified in the NOV fit within the routine maintenance, repair and replacement exemption contained within the NSR regulations or are otherwise not subject to the NSR requirements. PSCo disagrees with the assertions contained in the NOV and intends to vigorously defend its position.

 

Cherokee Station Alleged Clean Air Act Violations — In January 2008, Xcel Energy received a notice letter from Rocky Mountain Clean Air Action stating that the group intends to sue Xcel Energy for alleged Clean Air Act violations at Cherokee Station. The group claims that Cherokee Station’s opacity emissions have exceeded allowable limits over the past five years and that its opacity monitors exceeded downtime limits. Xcel Energy disputes these claims and believes they are without merit. The Clean Air Act requires notice be given 60 days prior to filing a lawsuit. If the group does in fact file its threatened lawsuit, Xcel Energy will vigorously defend itself against these claims.

 

Legal Contingencies

 

Lawsuits and claims arise in the normal course of business. Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition of them. The ultimate outcome of these matters cannot presently be determined. Accordingly, the ultimate resolution of these matters could have a material adverse effect on Xcel Energy’s financial position and results of operations.

 

Gas Trading Litigation

 

e prime was a subsidiary of Xcel Energy Markets Holdings Inc., which is a wholly owned subsidiary of Xcel Energy. Among other things, e prime was in the business of natural gas trading and marketing. e prime has not engaged in natural gas trading or marketing activities since 2003. Twelve lawsuits have been commenced against e prime and Xcel Energy (and NSP-Wisconsin in one instance), alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. Xcel Energy, e prime, and NSP-Wisconsin deny these allegations and will vigorously defend against these lawsuits, including seeking dismissal and summary judgment.

 

The initial gas-trading lawsuit, a purported class action brought by wholesale natural gas purchasers, was filed in November 2003 in the United States District Court in the Eastern District of California. e prime is one of several defendants named in the complaint. This case is captioned Texas-Ohio Energy vs. CenterPoint Energy. The other eleven cases arising out of the same or similar set of facts are captioned Fairhaven Power Company vs. EnCana Corporation et al; Ableman Art Glass vs. EnCana Corporation et al; Utility Savings and Refund Services LLP vs. Reliant Energy Services Inc. et al; Sinclair Oil Corporation vs. e prime and Xcel Energy Inc.; Ever-Bloom Inc. vs. Xcel Energy Inc. and e prime et al; Learjet, Inc. vs. e prime and Xcel Energy Inc et al; J.P. Morgan Trust Company vs. e prime and Xcel Energy Inc. et al; Breckenridge Brewery vs. e prime and Xcel Energy Inc. et al; Missouri Public Service Commission vs. e prime, inc. and Xcel Energy Inc. et al; Arandell vs. e prime, Xcel Energy, NSP-Wisconsin et al and Hartford Regional Medical Center vs. e prime, Xcel Energy et al. Many of these cases involve multiple defendants and have been transferred to Judge Phillip Pro of the United States

 

23



 

District Court in Nevada, who is the judge assigned to the western area wholesale natural gas antitrust litigation. An exception is the Missouri Public Service Commission case, which was remanded to Missouri state court in November 2007.

 

In April 2005, Judge Pro granted defendants’ motion to dismiss in Texas Ohio Energy based upon the filed rate doctrine. Based upon this same legal doctrine, Judge Pro subsequently granted defendants’ motion to dismiss in Fairhaven Power Company, Ableman Art Glass and Utility Savings and Refund Services. Plaintiffs subsequently appealed these dismissals to the Ninth Circuit Court of Appeals. In September 2007, the Ninth Circuit Court of Appeals reversed the dismissal and remanded the lawsuits to Judge Pro for consideration of whether any of plaintiffs’ claims are based upon retail rates not directly barred by the filed rate doctrine.  e prime and some other defendants were dismissed from the Breckenridge  lawsuit in February 2008, but Xcel Energy remains a defendant in that lawsuit and e prime Energy Marketing was added as a defendant in February 2008.

 

All of the gas trading lawsuits are in the early procedural stages of litigation. No trial dates have been set for any of these lawsuits; however, defendants’ motions to dismiss are pending in the Missouri Public Service Commission matter, and defendants’ summary judgment motions are pending in the Learjet and J.P. Morgan matters.

 

Cabin Creek Hydro Generating Station Accident

 

On Oct. 2, 2007, employees of RPI Coatings Inc. (RPI), a contractor retained by PSCo, were applying an epoxy coating to the inside of a penstock at PSCo’s Cabin Creek Hydro Generating Station near Georgetown, Colo. This work was being performed as part of a corrosion prevention effort. At approximately 2:00 p.m., a fire occurred inside the penstock, which is a 4,000-foot long, 12-foot wide pipe used to deliver water from a reservoir to the hydro facility. Four of the nine RPI employees working inside the penstock were positioned below the fire and were able to exit the pipe. The remaining five RPI employees were unable to exit the penstock. Rescue crews located the five employees a few hours later and confirmed their deaths. The accident was investigated by several state and federal agencies, including the federal Occupational Safety and Health Administration (OSHA), U.S. Chemical Safety Board and the Colorado Bureau of Investigations. In March 2008, OSHA proposed penalties totaling $189,900 for twenty-two serious violations and three willful violations arising out of the accident. On April 11, 2008, Xcel Energy notified OSHA that it intends to contest all of the proposed citations.

 

Environmental Litigation

 

Comanche 3 Permit Litigation — In August 2005, Citizens for Clean Air and Water in Pueblo and Southern Colorado and Clean Energy Action filed a complaint in Colorado state court against the CAPCD alleging that the division improperly granted permits to PSCo under Colorado’s Prevention of Significant Deterioration program for the construction and operation of Comanche 3. PSCo intervened in the case. In June 2006, the court ruled in PSCo’s favor and held that the Comanche 3 permits had been properly granted and plaintiffs’ claims to the contrary were without merit. Plaintiffs appealed the decision. In February 2008, the Colorado Court of Appeals affirmed the state court’s decision.  Plaintiffs filed a petition with the Colorado Supreme Court seeking discretionary review of the appellate court decision.

 

Carbon Dioxide Emissions Lawsuit — In July 2004, the attorneys general of eight states and New York City, as well as several environmental groups, filed lawsuits in U.S. District Court in the Southern District of New York against five utilities, including Xcel Energy, to force reductions in CO2 emissions. The other utilities include American Electric Power Co., Southern Co., Cinergy Corp. and Tennessee Valley Authority. The lawsuits allege that CO2 emitted by each company is a public nuisance as defined under state and federal common law because it has contributed to global warming. The lawsuits do not demand monetary damages. Instead, the lawsuits ask the court to order each utility to cap and reduce its CO2 emissions. In October 2004, Xcel Energy and the other defendants filed a motion to dismiss the lawsuit. On Sept. 19, 2005, the court granted the motion to dismiss on constitutional grounds. Plaintiffs filed an appeal to the Second Circuit Court of Appeals. In June 2007 the Second Circuit Court of Appeals issued an order requesting the parties to file a letter brief regarding the impact of the United States Supreme Court’s decision in Massachusetts v. EPA, 127 S.Ct. 1438 (April 2, 2007) on the issues raised by the parties on appeal. Among other things, in its decision in Massachusetts v. EPA, the United States Supreme Court held that CO2 emissions are a “pollutant” subject to regulation by the EPA under the Clean Air Act. In response to the request of the Second Circuit Court of Appeals, in June 2007, the defendant utilities filed a letter brief stating the position that the United States Supreme Court’s decision supports the arguments raised by the utilities on appeal. The Court of Appeals has taken the matter under advisement and is expected to issue an opinion in due course.

 

Comer vs. Xcel Energy Inc. et al. — In April 2006, Xcel Energy received notice of a purported class action lawsuit filed in U.S. District Court in the Southern District of Mississippi. The lawsuit names more than 45 oil, chemical and utility companies, including Xcel Energy, as defendants and alleges that defendants’ CO2 emissions “were a proximate and direct cause of the increase in the destructive capacity of Hurricane Katrina.” Plaintiffs allege in support of their claim, several legal

 

24



 

theories, including negligence and public and private nuisance and seek damages related to the loss resulting from the hurricane. Xcel Energy believes this lawsuit is without merit and intends to vigorously defend itself against these claims. In August 2007, the court dismissed the lawsuit in its entirety against all defendants on constitutional grounds. In September 2007, plaintiffs filed a notice of appeal to the Fifth Circuit Court of Appeals. The Court of Appeals has taken the matter under advisement and is expected to issue an opinion in due course.

 

Native Village of Kivalina vs. Xcel Energy Inc. et al. — In February 2008, the City and Native Village of Kivalina, Alaska, filed a lawsuit against Xcel Energy and 23 other oil, gas and coal companies.  The suit was brought on behalf of approximately 400 native Alaskans, the Inupiat Eskimo, who claim that Defendants’ emission of carbon dioxide and other greenhouse gases contribute to global warming, which is harming their village.  Plaintiffs claim that as a consequence, the entire village must be relocated at a cost of between $95 million and $400 million.  Plaintiffs assert a nuisance claim under federal and state common law, as well as a claim asserting “concert of action” in which defendants are alleged to have engaged in tortious acts in concert with each other.  Xcel Energy was not named in the civil conspiracy claim.  Xcel Energy believes the claims asserted in this lawsuit are without merit. A response to the complaint is due on or before June 30, 2008.

 

Employment, Tort and Commercial Litigation

 

Siewert vs. Xcel Energy — In June 2004, plaintiffs, the owners and operators of a Minnesota dairy farm, brought an action in Minnesota state court against NSP-Minnesota alleging negligence in the handling, supplying, distributing and selling of electrical power systems; negligence in the construction and maintenance of distribution systems; and failure to warn or adequately test such systems. Plaintiffs allege decreased milk production, injury, and damage to a dairy herd as a result of stray voltage resulting from NSP-Minnesota’s distribution system. Plaintiffs claim losses of approximately $7 million. NSP-Minnesota denies all allegations. After its motion to dismiss plaintiffs’ claims was denied, NSP-Minnesota filed a motion to certify questions for immediate appellate review. In October 2007, the court granted NSP- Minnesota’s motion for certification, and the parties have filed briefs on appeal.

 

Saemrow Dairy Partnership vs. Xcel Energy — In December 2006, plaintiffs, the owners and operators of a Minnesota dairy farm, brought an action in Minnesota state court against NSP-Minnesota alleging negligence in the handling, supplying, distributing and selling of electrical power systems and in the construction and maintenance of distribution systems. They also alleged failure to warn or adequately test such systems. Plaintiffs allege decreased milk production, injury, and damage to a dairy herd as a result of stray voltage resulting from NSP-Minnesota’s distribution system. Plaintiffs claim losses approximately $9 million. NSP-Minnesota denies all allegations.  A confidential settlement of this matter was reached at mediation in March 2008 and will not have a material financial impact on NSP-Minnesota or Xcel Energy.

 

Qwest vs. Xcel Energy Inc. — In June 2004, an employee of PSCo was seriously injured when a pole owned by Qwest malfunctioned. In September 2005, the employee commenced an action against Qwest in Denver state court. In April 2006, Qwest filed a third party complaint against PSCo based on terms in a joint pole use agreement between Qwest and PSCo. Pursuant to this agreement, Qwest asserted PSCo had an affirmative duty to properly train and instruct its employees on pole safety, including testing the pole for soundness before climbing. In May 2006, PSCo filed a counterclaim against Qwest asserting Qwest had a duty to PSCo and an obligation under the contract to maintain its poles in a safe and serviceable condition. In May 2007, the matter was tried and the jury found Qwest solely liable for the accident and this determination resulted in an award of damages in the amount of approximately $90 million. In January 2008, Qwest filed a notice of appeal.

 

Hoffman vs. Northern States Power Company — In March 2006, a purported class action complaint was filed in Minnesota state court, on behalf of NSP-Minnesota’s residential customers in Minnesota, North Dakota and South Dakota for alleged breach of a contractual obligation to maintain and inspect the points of connection between NSP-Minnesota’s wires and customers’ homes within the meter box. Plaintiffs claim NSP-Minnesota’s alleged breach results in an increased risk of fire and is in violation of tariffs on file with the MPUC. Plaintiffs seek injunctive relief and damages in an amount equal to the value of inspections plaintiffs claim NSP-Minnesota was required to perform over the past six years. In August 2006, NSP-Minnesota filed a motion for dismissal on the pleadings. In November 2006, the court issued an order denying NSP-Minnesota’s motion, but later, pursuant to a motion by NSP-Minnesota, certified the issues raised in NSP-Minnesota’s original motion for appeal as important and doubtful, and NSP-Minnesota filed an appeal with the Minnesota Court of Appeals. On Jan. 22, 2008, the Minnesota Court of Appeals determined the plaintiffs’ claims are barred by the filed rate doctrine and remanded the case to the district court for dismissal.  Plaintiffs have petitioned the Minnesota Supreme Court for discretionary review, and on April 15, 2008, the court granted the petition.  The matter will be briefed by both parties, followed by an oral argument at a future date.

 

MGP Insurance Coverage Litigation — In October 2003, NSP-Wisconsin initiated discussions with its insurers regarding the availability of insurance coverage for costs associated with the remediation of four former MGP sites located in Ashland,

 

25



 

Chippewa Falls, Eau Claire and LaCrosse, Wis. In lieu of participating in discussions, in October 2003, two of NSP-Wisconsin’s insurers, St. Paul Fire & Marine Insurance Co. and St. Paul Mercury Insurance Co., commenced litigation against NSP-Wisconsin in Minnesota state district court. In November 2003, NSP-Wisconsin commenced suit in Wisconsin state circuit court against St. Paul Fire & Marine Insurance Co. and its other insurers. Subsequently, the Minnesota court enjoined NSP-Wisconsin from pursuing the Wisconsin litigation. The Wisconsin action remains in abeyance.

 

NSP-Wisconsin has reached settlements with 22 insurers, and these insurers have been dismissed from both the Minnesota and Wisconsin actions.

 

In July 2007, the Minnesota state court issued a decision on allocation, reaffirming its prior rulings that Minnesota law on allocation should apply and ordering the dismissal, without prejudice, of eleven insurers whose coverage would not be triggered under such an allocation method. In September 2007, NSP-Wisconsin commenced an appeal in the Court of Appeals for Minnesota challenging the dismissal of these carriers. In November 2007, Ranger Insurance Company (Ranger) and TIG Insurance Company (TIG) filed a motion to dismiss NSP-Wisconsin’s appeal, asserting that NSP-Wisconsin’s failure to serve Continental Insurance Company, as successor in interest to certain policies issued by Harbor Insurance Company (Harbor), requires dismissal of NSP-Wisconsin’s appeal. In February 2008, the Court of Appeals issued an order deferring a decision on the procedural motion filed by Harbor and TIG and referring the motion to the panel assigned to consider the merits of the appeal.

 

In April 2008, the Court of Appeals issued an order staying briefing until further order of the court.  The order was issued in response to NSP-Wisconsin’s request that oral argument be deferred pending a decision by the Wisconsin Supreme Court in Plastics Engineering Co. vs. Liberty Mutual Insurance Co.  In Plastics Engineering Co., the Wisconsin Supreme Court will consider the method of allocation to be adopted in Wisconsin.

 

The PSCW has established a deferral process whereby clean-up costs associated with the remediation of former MGP sites are deferred and, if approved by the PSCW, recovered from ratepayers. Carrying charges associated with these clean-up costs are not subject to the deferral process and are not recoverable from ratepayers. Any insurance proceeds received by NSP-Wisconsin will be credited to ratepayers. None of the aforementioned lawsuit settlements are expected to have a material effect on Xcel Energy’s consolidated financial statements.

 

Nuclear Waste Disposal Litigation — In 1998, NSP-Minnesota filed a complaint in the U.S. Court of Federal Claims against the United States requesting breach of contract damages for the U.S. Department of Energy’s (DOE) failure to begin accepting spent nuclear fuel by Jan. 31, 1998, as required by the contract between the DOE and NSP-Minnesota. At trial, NSP-Minnesota claimed damages in excess of $100 million through Dec. 31, 2004. On Sept. 26, 2007, the court awarded NSP-Minnesota $116.5 million in damages. In December 2007, the court denied the DOE’s motion for reconsideration. In February 2008, the DOE filed an appeal to the U.S. Court of Appeals for the Federal Circuit, and NSP-Minnesota cross-appealed on the cost of capital issue.   In April 2008, the DOE asked the appellate court to stay briefing until the appeals in several other nuclear waste cases have been decided.  Results of the judgment will not be recorded in earnings until the appeal and regulatory treatment and amounts to be shared with ratepayers has been resolved. Given the uncertainties, it is unclear as to how much, if any, of this judgment will ultimately have a net impact on earnings.

 

In August 2007, NSP-Minnesota filed a second complaint against the DOE in the Court of Federal Claims (NSP II), again claiming breach of contract damages for the DOE’s continuing failure to abide by the terms of the contract. This lawsuit claims damages for the period Jan. 1, 2005 through June 30, 2007, which includes costs associated with the storage of spent nuclear fuel at Prairie Island and Monticello, as well as the costs of complying with state regulation relating to the storage of spent nuclear fuel. The amount of such damages is expected to exceed $40 million. In January 2008, the court granted the DOE’s motion to stay, subject to reevaluation after a decision has been filed in any one of the five pending appeals of nuclear waste storage cases.

 

Mallon vs. Xcel Energy Inc. — In July 2007, Theodore Mallon and TransFinancial Corporation filed a declaratory judgment action against Xcel Energy in U. S. District Court in Colorado (Mallon Federal Action). In this lawsuit, plaintiffs seek a determination that Xcel Energy is not entitled to assert claims against plaintiffs related to the 1984 and 1985 sale of COLI to PSCo, a predecessor of Xcel Energy. In August 2007, Xcel Energy, PSCo and PSRI commenced a lawsuit in Colorado state court against Mallon and TransFinancial Corporation (Mallon State Action). In the Mallon State Action, Xcel Energy, PSCo and PSRI seek damages against Mallon and TransFinancial for, among other things, breach of contract and breach of fiduciary duties associated with the sale of the COLI policies. In August 2007, Xcel Energy also filed a motion to stay or, in the alternative, to dismiss the Mallon Federal Action. In September 2007, a motion to stay the Mallon State Court action was subsequently filed by Mallon and TransFinancial. In November 2007, the U.S. District Court in Colorado dismissed the

 

26



 

complaint in the Mallon Federal Action and Mallon and TransFinancial subsequently withdrew their motion to stay the Mallon State Court Action.

 

Fru-Con Construction Corporation vs. Utility Engineering (UE) et al. — In March 2005, Fru-Con Construction Corporation (Fru-Con) commenced a lawsuit in U.S. District Court in the Eastern District of California against UE and the Sacramento Municipal Utility District (SMUD) for damages allegedly suffered during the construction of a natural gas-fired, combined-cycle power plant in Sacramento County. Fru-Con’s complaint alleges that it entered into a contract with SMUD to construct the power plant and further alleges that UE was negligent with regard to the design services it furnished to SMUD. In August 2005, the court granted UE’s motion to dismiss. Because SMUD remains a defendant in this action, the court has not entered a final judgment subject to an appeal with respect to its order to dismiss UE from the lawsuit. Because this lawsuit was commenced prior to the April 2005, closing of the sale of UE to Zachry, Xcel Energy is obligated to indemnify Zachry for damages related to this case up to $17.5 million. Pursuant to the terms of its professional liability policy, UE is insured up to $35 million.

 

Lamb County Electric Cooperative (LCEC) — In 1995, LCEC petitioned the PUCT for a cease and desist order against SPS alleging SPS was unlawfully providing service to oil field customers in LCEC’s certificated area. In May 2003, the PUCT issued an order denying LCEC’s petition based on its determination that SPS in 1976 was granted a certificate to serve the disputed customers. LCEC appealed the decision to the District Court in Travis County, Texas. In August 2004, the court affirmed the decision of the PUCT. In September 2004, LCEC appealed the District Court’s decision to the Court of Appeals for the Third Supreme Judicial District of the state of Texas. This appeal is currently pending.

 

In 1996, LCEC filed a suit for damages against SPS in the District Court in Lamb County, Texas, based on the same facts alleged in the petition for a cease and desist order at the PUCT. This suit has been dormant since it was filed, awaiting a final determination of the legality of SPS providing electric service to the disputed customers. The PUCT order from May 2003, which found SPS was legally serving the disputed customers, collaterally determines the issue of liability contrary to LCEC’s position in the suit. An adverse ruling on the appeal of May 2003 PUCT order could result in a different determination of the legality of SPS’ service to the disputed customers.

 

8.     Short-Term Borrowings and Other Financing Instruments

 

Short-Term Borrowings

 

Commercial Paper — At March 31, 2008 and Dec. 31, 2007, Xcel Energy and its utility subsidiaries had commercial paper outstanding of approximately $377.9 million and $1,088.6 million, respectively.  The weighted average interest rates at March 31, 2008 and Dec. 31, 2007 were 3.54 percent and 5.57 percent, respectively.

 

Guarantees

 

Xcel Energy provides guarantees and bond indemnities supporting certain subsidiaries. The guarantees issued by Xcel Energy guarantee payment or performance by its subsidiaries under specified agreements or transactions. As a result, Xcel Energy’s exposure under the guarantees is based upon the net liability of the relevant subsidiary under the specified agreements or transactions. Most of the guarantees issued by Xcel Energy limit the exposure of Xcel Energy to a maximum amount stated in the guarantees. On March 31, 2008 and Dec. 31, 2007, Xcel Energy had issued guarantees of up to $75.2 million with $17.5 million of known exposure under these guarantees. In addition, Xcel Energy provides indemnity protection for bonds issued for itself and its subsidiaries. The total amount of bonds with this indemnity outstanding as of March 31, 2008 and Dec. 31, 2007, was approximately $31.7 million and $31.6 million, respectively. The total exposure of this indemnification cannot be determined at this time. Xcel Energy believes the exposure to be significantly less than the total amount of bonds outstanding.

 

9.      Long-Term Borrowings and Other Financing Instruments

 

Junior Subordinated Notes

 

On Jan. 16, 2008, Xcel Energy issued $400 million of 7.6 percent junior subordinated notes (Junior Notes) due 2068.  Due to certain features, rating agencies consider the Junior Notes to be hybrid debt instruments with a combination of debt and equity characteristics.  The Junior Notes are not redeemable by Xcel Energy prior to 2013 without payment of a make-whole premium.  The proceeds from this offering were used to repay short-term debt.

 

27



 

Interest payments on the Junior Notes may be deferred on one or more occasions for up to 10 consecutive years.  If the interest payments on the Junior Notes are deferred, Xcel Energy may not declare or pay any dividends or distributions, or redeem, purchase, acquire, or make a liquidation payment on, any shares of its capital stock.  Also during the deferral period, Xcel Energy may not make any principal or interest payments on, or repay, purchase or redeem any of its debt securities that are equal in right of payment with, or subordinated to, the Junior Notes.  Xcel Energy also may not make payments on any guarantees equal in right of payment with, or subordinated to, the Junior Notes.

 

In connection with the completion of this offering, Xcel Energy entered into a Replacement Capital Covenant (RCC) for the benefit of persons that buy, hold, or sell a specified series of Xcel Energy long-term indebtedness ranking senior to the Junior Notes.  Initially, Xcel Energy’s 6.50 percent Senior Notes due July 1, 2036, was specified as such series of long-term debt.  Under the terms of the RCC, Xcel Energy agrees not to redeem or repurchase all or part of the Junior Notes prior to 2038 unless qualifying securities are issued to non-affiliates in a replacement offering in the 180 days prior to the redemption or repurchase date.  Qualifying securities include those that have equity-like characteristics that are the same as, or more equity-like than, the applicable characteristics of the Junior Notes at the time of redemption or repurchase.

 

First Mortgage Bonds

 

On March 18, 2008, NSP-Minnesota issued $500 million of 5.25 percent first mortgage bonds, series due March 1, 2018. NSP-Minnesota added the net proceeds from the sale of the first mortgage bonds to its general funds and applied a portion of the proceeds to the repayment of commercial paper and borrowings under the utility money pool arrangement.

 

10.  Derivative Instruments

 

Xcel Energy and its subsidiaries use derivative instruments in connection with its utility commodity price, interest rate, short-term wholesale and commodity trading activities, including forward contracts, futures, swaps and options.  Qualifying hedging relationships are designated as either a hedge of a forecasted transaction or future cash flow (cash flow hedge), or a hedge of a recognized asset, liability or firm commitment (fair value hedge).  The types of qualifying hedging transactions that Xcel Energy and its subsidiaries are currently engaged in are discussed below.

 

Cash Flow Hedges

 

Commodity Cash Flow Hedges Xcel Energy’s utility subsidiaries enter into derivative instruments to manage variability of future cash flows from changes in commodity prices.  These derivative instruments are designated as cash flow hedges for accounting purposes.  At March 31, 2008, Xcel Energy had various commodity-related contracts designated as cash flow hedges extending through December 2009.  The fair value of these cash flow hedges is recorded in other comprehensive income or deferred as a regulatory asset or liability.  This classification is based on the regulatory recovery mechanisms in place.  This could include the purchase or sale of energy or energy-related products, the use of natural gas to generate electric energy or gas purchased for resale.

 

At March 31, 2008, Xcel Energy had $0.4 million in accumulated other comprehensive income related to commodity cash flow hedge contracts that is expected to be recognized in earnings during the next 12 months as the hedged transactions settle.

 

Interest Rate Cash Flow Hedges Xcel Energy and its subsidiaries enter into various instruments that effectively fix the interest payments on certain floating rate debt obligations or effectively fix the yield or price on a specified benchmark interest rate for a specific period.  These derivative instruments are designated as cash flow hedges for accounting purposes.

 

At March 31, 2008, Xcel Energy had $0.2 million in net losses in accumulated other comprehensive income related to interest rate swaps/locks that is expected to be recognized in earnings during the next 12 months.

 

The following table shows the major components of the derivative instruments valuation in the consolidated balance sheets at March 31 and Dec. 31:

 

28



 

 

 

March 31, 2008

 

Dec. 31, 2007

 

(Thousands of Dollars)

 

Derivative
Instruments
Valuation -
Assets

 

Derivative
Instruments
Valuation -
Liabilities

 

Derivative
Instruments
Valuation -
Assets

 

Derivative
Instruments
Valuation -
Liabilities

 

Long term purchased power agreements

 

$

413,754

 

$

392,977

 

$

426,774

 

$

401,313

 

Electric and natural gas trading and hedging instruments

 

36,576

 

17,693

 

51,106

 

21,694

 

Interest rate hedging instruments

 

643

 

7,127

 

535

 

20,223

 

Total

 

$

450,973

 

$

417,797

 

$

478,415

 

$

443,230

 

 

In 2003, as a result of FASB Statement 133 Implementation Issue No. C20, Xcel Energy began recording several long-term purchased power agreements at fair value due to accounting requirements related to underlying price adjustments. As these purchases are recovered through normal regulatory recovery mechanisms in the respective jurisdictions, the changes in fair value for these contracts were offset by regulatory assets and liabilities. During the first quarter of 2006, Xcel Energy qualified these contracts under the normal purchase exception. Based on this qualification, the contracts are no longer adjusted to fair value and the previous carrying value of these contracts will be amortized over the remaining contract lives along with the offsetting regulatory assets and liabilities.

 

The impact of qualifying cash flow hedges on Xcel Energy’s accumulated other comprehensive income, included in the consolidated statements of common stockholders’ equity and comprehensive income, is detailed in the following table:

 

 

 

Three months ended March 31,

 

(Thousands of Dollars)

 

2008

 

2007

 

Accumulated other comprehensive (loss) income related to cash flow hedges at Jan. 1

 

$

(1,416

)

$

2,196

 

After-tax net unrealized losses related to derivatives accounted for as hedges

 

(5,601

)

(543

)

After-tax net realized gains on derivative transactions reclassified into earnings

 

(25

)

(257

)

Accumulated other comprehensive (loss) income related to cash flow hedges at March 31

 

$

(7,042

)

$

1,396

 

 

Fair Value Hedges

 

Interest Rate Fair Value Hedges — Xcel Energy enters into interest rate swap instruments that effectively hedge the fair value of fixed-rate debt.  The fair market value of Xcel Energy’s interest rate swaps at March 31, 2008, was an asset of approximately $0.6 million.

 

11.  Fair Value Measurements

 

Effective Jan. 1, 2008, Xcel Energy adopted SFAS No. 157 for recurring fair value measurements.  SFAS No. 157 provides a single definition of fair value and requires enhanced disclosures about assets and liabilities measured at fair value. SFAS No. 157 establishes a hierarchal framework for disclosing the observability of the inputs utilized in measuring assets and liabilities at fair value. The three levels defined by the SFAS No. 157 hierarchy and examples of each level are as follows:

 

Level 1 – Quoted prices are available in active markets for identical assets or liabilities as of the reported date. The types of assets and liabilities included in Level 1 are highly liquid and actively traded instruments with quoted prices, such as equities listed by the New York Stock Exchange and commodity derivative contracts listed on the New York Mercantile Exchange.

 

Level 2 – Pricing inputs are other than quoted prices in active markets, but are either directly or indirectly observable as of the reported date.  The types of assets and liabilities included in Level 2 are typically either comparable to actively traded securities or contracts, such as treasury securities with pricing interpolated from recent trades of similar securities, or priced with models using highly observable inputs, such as commodity options priced using observable forward prices and volatilities.

 

Level 3 – Significant inputs to pricing have little or no observability as of the reporting date.  The types of assets and liabilities included in Level 3 are those with inputs requiring significant management judgment or estimation, such as the complex and subjective models and forecasts used to determine the fair value of financial transmission rights.

 

The following table presents, for each of these hierarchy levels, Xcel Energy’s assets and liabilities that are measured at fair value on a recurring basis as of March 31, 2008:

 

29



 

(Thousands of Dollars)

 

Level 1

 

Level 2

 

Level 3

 

Counterparty 
Netting (a)

 

Net Balance

 

 

 

 

 

 

 

 

 

 

 

 

 

Assets

 

 

 

 

 

 

 

 

 

 

 

Nuclear decommissioning fund

 

$

674,409

 

$

486,687

 

$

97,232

 

$

 

$

1,258,328

 

Commodity derivatives

 

427

 

18,157

 

27,676

 

(9,684

)

36,576

 

Interest rate derivatives

 

 

643

 

 

 

643

 

Total

 

$

674,836

 

$

505,487

 

$

124,908

 

$

(9,684

)

$

1,295,547

 

 

 

 

 

 

 

 

 

 

 

 

 

Liabilities

 

 

 

 

 

 

 

 

 

 

 

Commodity derivatives

 

$

 

$

15,056

 

$

12,321

 

$

(9,684

)

$

17,693

 

Interest rate derivatives

 

 

7,127

 

 

 

7,127

 

Total

 

$

 

$

22,183

 

$

12,321

 

$

(9,684

)

$

24,820

 

 


(a) FIN 39 permits the netting of receivables and payables when a legally enforceable master netting agreement exists between Xcel Energy and a counterparty. A master netting agreement is an agreement between two parties who have multiple contracts with each other that provides for the net settlement of all contracts in the event of default on or termination of any one contract.

 

The following table presents the changes in Level 3 recurring fair value measurements for the three months ended March 31, 2008:

 

(Thousands of Dollars)

 

Commodity
Derivatives,
Net

 

Nuclear
Decommissioning
Fund

 

 

 

 

 

 

 

Balance, Jan. 1, 2008

 

$

19,466

 

$

108,656

 

Purchases, issuances, and settlements, net

 

(3,346

)

(10,251

)

Gains recognized in earnings

 

30

 

 

Losses recognized as regulatory assets and liabilities

 

(795

)

(1,173

)

Balance, March 31, 2008

 

$

15,355

 

$

97,232

 

 

Gains on Level 3 commodity derivatives recognized in earnings for the three months ended March 31, 2008, include $2.5 million of net unrealized gains relating to commodity derivatives held at March 31, 2008.  Realized and unrealized gains and losses on commodity trading activities are included in electric utility revenues.  Realized and unrealized gains and losses on short-term wholesale activities reflect the impact of regulatory recovery and resulting deferral as regulatory assets and liabilities.  Realized and unrealized gains and losses on nuclear decommissioning fund investments are deferred as a component of a nuclear decommissioning regulatory asset.

 

12.  Detail of Interest and Other Income, Net

 

Interest and other income, net of nonoperating expenses, for the three months ended March 31 consisted of the following:

 

 

 

Three months ended
March 31,

 

(Thousands of Dollars)

 

2008

 

2007

 

Interest income

 

$

7,510

 

$

4,791

 

Equity income in unconsolidated affiliates

 

510

 

1,078

 

Other nonoperating income

 

1,567

 

620

 

Minority interest income

 

248

 

134

 

Insurance policy expenses

 

(899

)

(5,775

)

Other nonoperating expenses

 

(52

)

(32

)

Total interest and other income, net

 

$

8,884

 

$

816

 

 

13. Common Stock and Equivalents

 

Xcel Energy has common stock equivalents consisting of convertible senior notes, 401(k) equity awards, restricted stock units and stock options.  Restricted stock units and performance shares are included as common stock equivalents when all necessary conditions for issuance have been satisfied by the end of the period being reported.

 

30



 

For the three months ended March 31, 2008 and 2007, Xcel Energy had approximately 8.1 million and 10.8 million stock options that were antidilutive and excluded from the dilutive earnings per share calculation, respectively.

 

The dilutive impact of common stock equivalents affected earnings per share as follows for the three months ending March 31, 2008 and 2007:

 

 

 

Three months ended March 31, 2008

 

Three months ended March 31, 2007

 

(Amounts in thousands, except per share amounts)

 

Income

 

Shares

 

Per-share
Amount

 

Income

 

Shares

 

Per-share
Amount

 

Income from continuing operations

 

$

153,994

 

 

 

 

 

$

118,514

 

 

 

 

 

Less: Dividend requirements on preferred stock

 

(1,060

)

 

 

 

 

(1,060

)

 

 

 

 

Basic earnings per share:

 

 

 

 

 

 

 

 

 

 

 

 

 

Income from continuing operations

 

152,934

 

429,563

 

$

0.35

 

117,454

 

408,003

 

$

0.29

 

Effect of dilutive securities:

 

 

 

 

 

 

 

 

 

 

 

 

 

Convertible debt

 

780

 

4,663

 

 

 

3,806

 

23,310

 

 

 

401(k) equity awards

 

 

599

 

 

 

 

611

 

 

 

Stock options

 

 

28

 

 

 

 

130

 

 

 

Diluted earnings per share:

 

 

 

 

 

 

 

 

 

 

 

 

 

Income from continuing operations and assumed conversions

 

$

153,714

 

434,853

 

$

0.35

 

$

121,260

 

432,054

 

$

0.28

 

 

14. Benefit Plans and Other Postretirement Benefits

 

Components of Net Periodic Benefit Cost (Credit)

 

 

 

Three months ended March 31,

 

 

 

2008 (1)

 

2007 (1)

 

2008

 

2007

 

(Thousands of Dollars)

 

Pension Benefits

 

Postretirement Health
Care Benefits

 

Service cost

 

$

16,773

 

$

16,485

 

$

1,464

 

$

1,701

 

Interest cost

 

40,583

 

39,598

 

12,546

 

13,603

 

Expected return on plan assets

 

(68,472

)

(65,891

)

(7,500

)

(7,618

)

Amortization of transition obligation

 

 

 

3,644

 

3,611

 

Amortization of prior service cost (credit)

 

5,166

 

6,487

 

(544

)

(545

)

Amortization of net loss

 

2,859

 

3,867

 

2,718

 

4,994

 

Net periodic benefit cost (credit)

 

(3,091

)

546

 

12,328

 

15,746

 

Credits not recognized due to the effects of regulation

 

2,592

 

2,680

 

 

 

Additional cost recognized due to the effects of regulation

 

 

 

973

 

973

 

Net benefit cost (credit) recognized for financial reporting

 

$

(499

)

$

3,226

 

$

13,301

 

$

16,719

 

 


(1)   Includes qualified and non-qualified pension net periodic benefit cost.

 

31



 

15. Segment Information

 

Xcel Energy has the following reportable segments: regulated electric utility and regulated natural gas utility.  Commodity trading operations performed by regulated operating companies are not a reportable segment.  Commodity trading results are included in the regulated electric utility segment.

 

(Thousands of Dollars)

 

Regulated
Electric
Utility

 

Regulated
Natural Gas
Utility

 

All
Other

 

Reconciling
Eliminations

 

Consolidated
Total

 

 

 

 

 

 

 

 

 

 

 

 

 

Three months ended March 31, 2008

 

 

 

 

 

 

 

 

 

 

 

Operating revenues from external customers

 

$

1,973,314

 

$

1,034,127

 

$

20,947

 

$

 

$

3,028,388

 

Intersegment revenues

 

246

 

2,626

 

 

(2,872

)

 

Total revenues

 

$

1,973,560

 

$

1,036,753

 

$

20,947

 

$

(2,872

)

$

3,028,388

 

Income (loss) from continuing operations

 

$

93,076

 

$

67,566

 

$

9,651

 

$

(16,299

)

$

153,994

 

Three months ended March 31, 2007

 

 

 

 

 

 

 

 

 

 

 

Operating revenues from external customers

 

$

1,815,803

 

$

927,422

 

$

20,437

 

$

 

$

2,763,662

 

Intersegment revenues

 

329

 

4,388

 

 

(4,717

)

 

Total revenues

 

$

1,816,132

 

$

931,810

 

$

20,437

 

$

(4,717

)

$

2,763,662

 

Income (loss) from continuing operations

 

$

72,135

 

$

56,921

 

$

10,780

 

$

(21,322

)

$

118,514

 

 

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 

The following discussion and analysis by management focuses on those factors that had a material effect on Xcel Energy’s financial condition and results of operations during the periods presented, or are expected to have a material impact in the future. It should be read in conjunction with the accompanying unaudited consolidated financial statements and notes.

 

Except for the historical statements contained in this report, the matters discussed in the following discussion and analysis are forward-looking statements that are subject to certain risks, uncertainties and assumptions. Such forward-looking statements are intended to be identified in this document by the words “anticipate,” “believe,” “estimate,” “expect,” “intend,” “may,” “objective,” “outlook,” “plan,” “project,” “possible,” “potential,” “should” and similar expressions. Actual results may vary materially. Forward-looking statements speak only as of the date they are made, and we do not undertake any obligation to update them to reflect changes that occur after that date.  Factors that could cause actual results to differ materially include, but are not limited to: general economic conditions, including the availability of credit and its impact on capital expenditures and the ability of Xcel Energy and its subsidiaries to obtain financing on favorable terms; business conditions in the energy industry; actions of credit rating agencies; competitive factors, including the extent and timing of the entry of additional competition in the markets served by Xcel Energy and its subsidiaries; unusual weather; effects of geopolitical events, including war and acts of terrorism; state, federal and foreign legislative and regulatory initiatives that affect cost and investment recovery, have an impact on rates or have an impact on asset operation or ownership or impose environmental compliance conditions; structures that affect the speed and degree to which competition enters the electric and natural gas markets; costs and other effects of legal and administrative proceedings, settlements, investigations and claims; actions of accounting regulatory bodies; the items described under Factors Affecting Results of Continuing Operations; and the other risk factors listed from time to time by Xcel Energy in reports filed with the SEC, including “Risk Factors” in Item 1A of Xcel Energy’s Form 10-K for the year ended Dec. 31, 2007, and Exhibit 99.01 to this report on Form 10-Q for the quarter ended March 31, 2008.

 

RESULTS OF OPERATIONS

 

Summary of Financial Results

 

The following table summarizes the earnings contributions.  Continuing operations consist of the following:

 

·      Regulated utility subsidiaries, operating in the electric and natural gas segments; and

·      Other nonregulated subsidiaries and the holding company, where corporate financing activity occurs.

 

Discontinued operations consist of Seren Innovations Inc., NRG Energy, Inc., e prime, Xcel Energy International, Utility Engineering, and Quixx, which were all sold in 2006 or earlier.

 

32



 

See Note 4 to the consolidated financial statements for a further discussion of discontinued operations.

 

 

 

Three months ended
March 31,

 

Contribution to Earnings (Millions of Dollars)

 

2008

 

2007

 

 

 

 

 

 

 

GAAP income

 

 

 

 

 

Regulated electric utility income — continuing operations

 

$

93.1

 

$

72.1

 

Regulated natural gas utility income — continuing operations

 

67.6

 

56.9

 

Other utility results

 

9.7

 

10.4

 

Utility segment income — continuing operations

 

170.4

 

139.4

 

 

 

 

 

 

 

Holding company costs and other results

 

(16.4

)

(20.9

)

Income — continuing operations

 

154.0

 

118.5

 

 

 

 

 

 

 

Income (loss) — discontinued operations

 

(0.9

)

1.2

 

Total GAAP income

 

$

153.1

 

$

119.7

 

 

 

 

Three months ended
March 31,

 

 

 

2008

 

2007

 

 

 

 

 

 

 

GAAP earnings per share contribution

 

 

 

 

 

Regulated electric utility — continuing operations

 

$

0.21

 

$

0.17

 

Regulated natural gas utility — continuing operations

 

0.16

 

0.13

 

Other utility results

 

0.02

 

0.02

 

Utility segment earnings per share — continuing operations

 

0.39

 

0.32

 

 

 

 

 

 

 

Holding company costs and other results

 

(0.04

)

(0.04

)

Total GAAP earnings per share — diluted

 

$

0.35

 

$

0.28

 

 

The following table summarizes significant components contributing to the changes in the first quarter of 2008 diluted earnings per share compared with the same period in 2007, which are discussed in more detail later.

 

Increase (decrease)

 

Three months
ended March 31,

 

2007 ongoing earnings per share

 

$

0.27

 

PSRI earnings

 

0.01

 

2007 GAAP earnings per share

 

0.28

 

 

 

 

 

Components of Change — 2008 vs. 2007

 

 

 

Higher base electric utility margins

 

0.07

 

Higher natural gas margins

 

0.03

 

Higher interest and other income

 

0.01

 

Higher operating and maintenance expense

 

(0.02

)

Higher effective tax rate

 

(0.02

)

Higher depreciation and amortization

 

(0.01

)

Other

 

0.01

 

2008 GAAP earnings per share

 

$

0.35

 

 

During 2007, Xcel Energy resolved a dispute with the IRS regarding its COLI program.  Excluding the impact of the COLI program, Xcel Energy’s ongoing first quarter 2008 earnings were $155 million, or $0.35 per share, compared with first quarter 2007 ongoing earnings of $114 million, or $0.27 per share.  The following table provides a reconciliation of GAAP earnings per share to ongoing earnings per share for 2008 and 2007.

 

33



 

 

 

Three Months ended March 31,

 

(Millions of Dollars)

 

2008

 

2007

 

Ongoing earnings

 

$

155.3

 

$

113.5

 

PSRI earnings (loss)

 

(1.3

)

5.0

 

Total continuing operations

 

154.0

 

118.5

 

Discontinued operations

 

(0.9

)

1.2

 

Total GAAP earnings

 

$

153.1

 

$

119.7

 

 

 

 

Three Months ended March 31,

 

 

 

2008

 

2007

 

Ongoing earnings per share

 

$

0.35

 

$

0.27

 

PSRI earnings

 

 

0.01

 

Total GAAP earnings per share

 

$

0.35

 

$

0.28

 

 

As a result of the termination of the COLI program, Xcel Energy’s management believes that ongoing earnings provide a more meaningful comparison of earnings results between different periods in which the COLI program was in place and is more representative of Xcel Energy’s fundamental core earnings power. Xcel Energy’s management uses ongoing earnings internally for financial planning and analysis, for reporting of results to the board of directors, in determining whether performance targets are met for performance-based compensation and when communicating its earnings outlook to analysts and investors.

 

Utility Results

 

Higher first quarter 2008 earnings were primarily attributable to higher electric and natural gas margins, reflecting various rate increases, weather-normalized retail sales growth, higher rider recovery, the impact of favorable temperatures and leap year, which increased sales.  Partially offsetting these positive factors were higher operating and maintenance expense and increased depreciation expense.

 

The following summarizes the estimated impact of weather on regulated utility earnings per share, based on estimated temperature variations from historical averages (excluding the impact on commodity trading operations):

 

 

 

Three months ended

 

 

 

March 31,

 

 

 

2008 vs.
Normal

 

2007 vs.
Normal

 

2008 vs. 2007

 

Retail electric

 

$

0.01

 

$

0.01

 

$

0.00

 

Firm natural gas

 

0.01

 

0.00

 

0.01

 

Total

 

$

0.02

 

$

0.01

 

$

0.01

 

 

Other Results — Holding Company and Other Costs

 

Financing Costs and Preferred Dividends — Holding company results include interest expense and preferred dividend costs, which are incurred at the Xcel Energy and intermediate holding company levels and are not directly assigned to individual subsidiaries.

 

Discontinued Operations

 

All Other — Seren Innovations Inc., NRG, e prime, Xcel Energy International, Utility Engineering, and Quixx, which were all sold in 2006 or earlier, have activity reflected on Xcel Energy’s financial statements.

 

Income Statement Analysis — First Quarter 2008 vs. First Quarter 2007

 

Electric Utility, Short-Term Wholesale and Commodity Trading Margins

 

Electric fuel and purchased power expenses tend to vary with changing retail and wholesale sales requirements and cost changes in fuel and purchased power. Due to fuel and purchased energy cost-recovery mechanisms for customers in most states, the fluctuations in these costs do not materially affect electric utility margin.

 

34



 

Xcel Energy has two distinct forms of wholesale sales: short-term wholesale and commodity trading. Short-term wholesale refers to energy-related purchase and sales activity, and the use of financial instruments associated with the fuel required for, and energy produced from, Xcel Energy’s generation assets or the energy and capacity purchased to serve native load. Commodity trading is not associated with Xcel Energy’s generation assets or the energy and capacity purchased to serve native load. Short-term wholesale and commodity trading activities are considered part of the electric utility segment.

 

Short-term wholesale and commodity trading margins reflect the estimated impact of regulatory sharing of margins, if applicable. Commodity trading revenues are reported net of related costs (i.e., on a margin basis) in the consolidated statements of income. Commodity trading expenses include purchased power, transmission, broker fees and other related costs.

 

The following table details the revenues and margin for base electric utility, short-term wholesale and commodity trading activities.

 

(Millions of Dollars)

 

Base
Electric
Utility

 

Short-Term
Wholesale

 

Commodity
Trading

 

Consolidated
Total

 

Three months ended March 31, 2008

 

 

 

 

 

 

 

 

 

Electric utility revenues (excluding commodity trading)

 

$

1,906

 

$

64

 

$

 

$

1,970